A production rate control policy for stochastic repair and remanufacturing systems
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Giutini, Ron & Gaudette, Kevin, 2003. "Remanufacturing: The next great opportunity for boosting US productivity," Business Horizons, Elsevier, vol. 46(6), pages 41-48.
- Li, Jianzhi & González, Miguel & Zhu, Yun, 2009. "A hybrid simulation optimization method for production planning of dedicated remanufacturing," International Journal of Production Economics, Elsevier, vol. 117(2), pages 286-301, February.
- Tang, Ou & Grubbstrom, Robert W., 2005. "Considering stochastic lead times in a manufacturing/remanufacturing system with deterministic demands and returns," International Journal of Production Economics, Elsevier, vol. 93(1), pages 285-300, January.
- Fleischmann, Moritz & Bloemhof-Ruwaard, Jacqueline M. & Dekker, Rommert & van der Laan, Erwin & van Nunen, Jo A. E. E. & Van Wassenhove, Luk N., 1997. "Quantitative models for reverse logistics: A review," European Journal of Operational Research, Elsevier, vol. 103(1), pages 1-17, November.
- Kiesmuller, G. P., 2003. "A new approach for controlling a hybrid stochastic manufacturing/remanufacturing system with inventories and different leadtimes," European Journal of Operational Research, Elsevier, vol. 147(1), pages 62-71, May.
- Inderfurth, Karl & van der Laan, Erwin, 2001. "Leadtime effects and policy improvement for stochastic inventory control with remanufacturing," International Journal of Production Economics, Elsevier, vol. 71(1-3), pages 381-390, May.
- Guide, V. Daniel R. & Souza, Gilvan C. & van der Laan, Erwin, 2005. "Performance of static priority rules for shared facilities in a remanufacturing shop with disassembly and reassembly," European Journal of Operational Research, Elsevier, vol. 164(2), pages 341-353, July.
- Mahadevan, B. & Pyke, David F. & Fleischmann, Moritz, 2003.
"Periodic review, push inventory policies for remanufacturing,"
European Journal of Operational Research, Elsevier, vol. 151(3), pages 536-551, December.
- Mahadevan, B. & Pyke, D.F. & Fleischmann, M., 2002. "Periodic Review, Push Inventory Policies for Remanufacturing," ERIM Report Series Research in Management ERS-2002-35-LIS, Erasmus Research Institute of Management (ERIM), ERIM is the joint research institute of the Rotterdam School of Management, Erasmus University and the Erasmus School of Economics (ESE) at Erasmus University Rotterdam.
- Gharbi, A. & Pellerin, R. & Sadr, J., 2008. "Production rate control for stochastic remanufacturing systems," International Journal of Production Economics, Elsevier, vol. 112(1), pages 37-47, March.
- Guide, V. Daniel R. & Srivastava, Rajesh, 1997. "Repairable inventory theory: Models and applications," European Journal of Operational Research, Elsevier, vol. 102(1), pages 1-20, October.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Liu, Gia-Shie, 2011. "Dynamic group instantaneous replacement policies for unreliable Markovian service systems," International Journal of Production Economics, Elsevier, vol. 130(2), pages 203-217, April.
- Hlioui, Rached & Gharbi, Ali & Hajji, Adnène, 2015. "Replenishment, production and quality control strategies in three-stage supply chain," International Journal of Production Economics, Elsevier, vol. 166(C), pages 90-102.
- Pokharel, Shaligram & Liang, Yijiong, 2012. "A model to evaluate acquisition price and quantity of used products for remanufacturing," International Journal of Production Economics, Elsevier, vol. 138(1), pages 170-176.
- Hajji, A. & Mhada, F. & Gharbi, A. & Pellerin, R. & Malhamé, R., 2011. "Integrated product specifications and productivity decision making in unreliable manufacturing systems," International Journal of Production Economics, Elsevier, vol. 129(1), pages 32-42, January.
- Mohsen Zamani & Mahdi Abolghasemi & Seyed Mohammad Seyed Hosseini & Mir Saman Pishvaee, 2019. "Considering pricing and uncertainty in designing a reverse logistics network," Papers 1909.11633, arXiv.org.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Ahiska, S. Sebnem & King, Russell E., 2010. "Life cycle inventory policy characterizations for a single-product recoverable system," International Journal of Production Economics, Elsevier, vol. 124(1), pages 51-61, March.
- de Brito, Marisa P. & Dekker, Rommert, 2003.
"Modelling product returns in inventory control--exploring the validity of general assumptions,"
International Journal of Production Economics, Elsevier, vol. 81(1), pages 225-241, January.
- de Brito, M.P. & Dekker, R., 2001. "Modelling product returns in inventory control - exploring the validity or general assumptions," Econometric Institute Research Papers EI 2001-27, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
- Gregory A. DeCroix, 2006. "Optimal Policy for a Multiechelon Inventory System with Remanufacturing," Operations Research, INFORMS, vol. 54(3), pages 532-543, June.
- Poles, Roberto, 2013. "System Dynamics modelling of a production and inventory system for remanufacturing to evaluate system improvement strategies," International Journal of Production Economics, Elsevier, vol. 144(1), pages 189-199.
- Felix T.S. Chan & Nan Li & S.H. Chung & Mozafar Saadat, 2017. "Management of sustainable manufacturing systems-a review on mathematical problems," International Journal of Production Research, Taylor & Francis Journals, vol. 55(4), pages 1210-1225, February.
- van der Laan, Erwin A. & Teunter, Ruud H., 2006.
"Simple heuristics for push and pull remanufacturing policies,"
European Journal of Operational Research, Elsevier, vol. 175(2), pages 1084-1102, December.
- van der Laan, E.A. & Teunter, R.H., 2004. "Simple heuristics for push and pull remanufacturing policies," ERIM Report Series Research in Management ERS-2004-090-LIS, Erasmus Research Institute of Management (ERIM), ERIM is the joint research institute of the Rotterdam School of Management, Erasmus University and the Erasmus School of Economics (ESE) at Erasmus University Rotterdam.
- van der Laan, E.A. & Teunter, R.H., 2004. "Simple heuristics for push and pull remanufacturing policies," Econometric Institute Research Papers EI 2004-34, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
- Sebnem Ahiska, S. & King, Russell E., 2010. "Inventory optimization in a one product recoverable manufacturing system," International Journal of Production Economics, Elsevier, vol. 124(1), pages 11-19, March.
- Takahashi, Katsuhiko & Morikawa, Katsumi & Myreshka & Takeda, Daisuke & Mizuno, Akihiko, 2007. "Inventory control for a MARKOVIAN remanufacturing system with stochastic decomposition process," International Journal of Production Economics, Elsevier, vol. 108(1-2), pages 416-425, July.
- Zolfagharinia, Hossein & Hafezi, Maryam & Farahani, Reza Zanjirani & Fahimnia, Behnam, 2014. "A hybrid two-stock inventory control model for a reverse supply chain," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 67(C), pages 141-161.
- Kim, Eungab & Saghafian, Soroush & Van Oyen, Mark P., 2013. "Joint control of production, remanufacturing, and disposal activities in a hybrid manufacturing–remanufacturing system," European Journal of Operational Research, Elsevier, vol. 231(2), pages 337-348.
- Kaya, Onur, 2010. "Incentive and production decisions for remanufacturing operations," European Journal of Operational Research, Elsevier, vol. 201(2), pages 442-453, March.
- Kilic, Onur A. & Tunc, Huseyin & Tarim, S. Armagan, 2018. "Heuristic policies for the stochastic economic lot sizing problem with remanufacturing under service level constraints," European Journal of Operational Research, Elsevier, vol. 267(3), pages 1102-1109.
- Gregory A. DeCroix & Jing-Sheng Song & Paul H. Zipkin, 2009. "Managing an Assemble-to-Order System with Returns," Manufacturing & Service Operations Management, INFORMS, vol. 11(1), pages 144-159, October.
- Corbacioglu, Umut & van der Laan, Erwin A., 2007. "Setting the holding cost rates in a two-product system with remanufacturing," International Journal of Production Economics, Elsevier, vol. 109(1-2), pages 185-194, September.
- Krikke, Harold & Hofenk, Dianne & Wang, Yacan, 2013. "Revealing an invisible giant: A comprehensive survey into return practices within original (closed-loop) supply chains," Resources, Conservation & Recycling, Elsevier, vol. 73(C), pages 239-250.
- Gharbi, A. & Pellerin, R. & Sadr, J., 2008. "Production rate control for stochastic remanufacturing systems," International Journal of Production Economics, Elsevier, vol. 112(1), pages 37-47, March.
- Gregory A. DeCroix & Paul H. Zipkin, 2005. "Inventory Management for an Assembly System with Product or Component Returns," Management Science, INFORMS, vol. 51(8), pages 1250-1265, August.
- Xiting Gong & Xiuli Chao, 2013. "Technical Note---Optimal Control Policy for Capacitated Inventory Systems with Remanufacturing," Operations Research, INFORMS, vol. 61(3), pages 603-611, June.
- Choi, Dae-Won & Hwang, Hark & Koh, Shie-Gheun, 2007. "A generalized ordering and recovery policy for reusable items," European Journal of Operational Research, Elsevier, vol. 182(2), pages 764-774, October.
- Deepak Lamba & Devendra K. Yadav & Akhilesh Barve & Ganapati Panda, 2020. "Prioritizing barriers in reverse logistics of E-commerce supply chain using fuzzy-analytic hierarchy process," Electronic Commerce Research, Springer, vol. 20(2), pages 381-403, June.
More about this item
Keywords
Repair Remanufacturing Overhaul Control policy Hedging points;Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:121:y:2009:i:1:p:39-48. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.