IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v118y2009i1p298-304.html
   My bibliography  Save this article

Periodic forecast and feedback to maintain target inventory level

Author

Listed:
  • Matuyama, Keisuke
  • Sumita, Tomofumi
  • Wakayama, Daiki

Abstract

In cases when a target inventory level is given and the demand is uncertain, it is difficult to provide an appropriate forecast and control policy that ensures a convergence to the inventory target. In this paper two different forecast formulae combined with two different feedback policies are investigated for a periodic review inventory system. A comparison based on analytical and simulation results is presented showing that the form of feedback is critical in case of large demand uncertainty.

Suggested Citation

  • Matuyama, Keisuke & Sumita, Tomofumi & Wakayama, Daiki, 2009. "Periodic forecast and feedback to maintain target inventory level," International Journal of Production Economics, Elsevier, vol. 118(1), pages 298-304, March.
  • Handle: RePEc:eee:proeco:v:118:y:2009:i:1:p:298-304
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925-5273(08)00277-6
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Bonney, Maurice & Popplewell, Keith & Matoug, Mahmoud, 1994. "Effect of errors and delays in inventory reporting on production system performance," International Journal of Production Economics, Elsevier, vol. 35(1-3), pages 93-105, June.
    2. Bonney, M. C., 1994. "Trends in inventory management," International Journal of Production Economics, Elsevier, vol. 35(1-3), pages 107-114, June.
    3. Herbert J. Vassian, 1955. "Application of Discrete Variable Servo Theory to Inventory Control," Operations Research, INFORMS, vol. 3(3), pages 272-282, August.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Fernandes, Rui & Gouveia, Borges & Pinho, Carlos, 2010. "Modeling Overstock," MPRA Paper 25126, University Library of Munich, Germany.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Disney, Stephen M. & Towill, Denis R. & Warburton, Roger D.H., 2006. "On the equivalence of control theoretic, differential, and difference equation approaches to modeling supply chains," International Journal of Production Economics, Elsevier, vol. 101(1), pages 194-208, May.
    2. Matsuyama, Keisuke, 1997. "Maintaining optimal inventory level by feedbacks," International Journal of Production Economics, Elsevier, vol. 53(1), pages 57-69, November.
    3. Disney, S.M. & Towill, D.R., 2005. "Eliminating drift in inventory and order based production control systems," International Journal of Production Economics, Elsevier, vol. 93(1), pages 331-344, January.
    4. Dejonckheere, J. & Disney, S. M. & Lambrecht, M. R. & Towill, D. R., 2003. "Measuring and avoiding the bullwhip effect: A control theoretic approach," European Journal of Operational Research, Elsevier, vol. 147(3), pages 567-590, June.
    5. Wang, Zhaodong & Wang, Xin & Ouyang, Yanfeng, 2015. "Bounded growth of the bullwhip effect under a class of nonlinear ordering policies," European Journal of Operational Research, Elsevier, vol. 247(1), pages 72-82.
    6. Ma, Yungao & Wang, Nengmin & He, Zhengwen & Lu, Jizhou & Liang, Huigang, 2015. "Analysis of the bullwhip effect in two parallel supply chains with interacting price-sensitive demands," European Journal of Operational Research, Elsevier, vol. 243(3), pages 815-825.
    7. de Vries, Jan, 2009. "Assessing inventory projects from a stakeholder perspective: Results of an empirical study," International Journal of Production Economics, Elsevier, vol. 118(1), pages 136-145, March.
    8. Hosoda, Takamichi & Disney, Stephen M., 2018. "A unified theory of the dynamics of closed-loop supply chains," European Journal of Operational Research, Elsevier, vol. 269(1), pages 313-326.
    9. Bonney, Maurice & Ratchev, Svetan & Moualek, Idir, 2003. "The changing relationship between production and inventory examined in a concurrent engineering context," International Journal of Production Economics, Elsevier, vol. 81(1), pages 243-254, January.
    10. de Vries, Jan, 2007. "Diagnosing inventory management systems: An empirical evaluation of a conceptual approach," International Journal of Production Economics, Elsevier, vol. 108(1-2), pages 63-73, July.
    11. Geary, S. & Disney, S.M. & Towill, D.R., 2006. "On bullwhip in supply chains--historical review, present practice and expected future impact," International Journal of Production Economics, Elsevier, vol. 101(1), pages 2-18, May.
    12. Kayakutlu, Gulgun & Buyukozkan, Gulcin, 2011. "Assessing performance factors for a 3PL in a value chain," International Journal of Production Economics, Elsevier, vol. 131(2), pages 441-452, June.
    13. A A Syntetos & J E Boylan & S M Disney, 2009. "Forecasting for inventory planning: a 50-year review," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 60(1), pages 149-160, May.
    14. Halas, Elzbieta & Fertsch, Marek, 2001. "Managing inventories in the machine building industry: : Results from empirically driven simulations," International Journal of Production Economics, Elsevier, vol. 71(1-3), pages 119-123, May.
    15. Lin, J. & Naim, M.M. & Purvis, L. & Gosling, J., 2017. "The extension and exploitation of the inventory and order based production control system archetype from 1982 to 2015," International Journal of Production Economics, Elsevier, vol. 194(C), pages 135-152.
    16. Persona, Alessandro & Battini, Daria & Manzini, Riccardo & Pareschi, Arrigo, 2007. "Optimal safety stock levels of subassemblies and manufacturing components," International Journal of Production Economics, Elsevier, vol. 110(1-2), pages 147-159, October.
    17. Warburton, Roger D. H., 2004. "An exact analytical solution to the production inventory control problem," International Journal of Production Economics, Elsevier, vol. 92(1), pages 81-96, November.
    18. Hosoda, Takamichi & Disney, Stephen M., 2012. "A delayed demand supply chain: Incentives for upstream players," Omega, Elsevier, vol. 40(4), pages 478-487.
    19. Bonney, M. C. & Head, M. A. & Tien, C. C. & Huang, N. & Barson, R. J., 1996. "Inventory and enterprise integration," International Journal of Production Economics, Elsevier, vol. 45(1-3), pages 91-99, August.
    20. Disney, S. M. & Naim, M. M. & Potter, A., 2004. "Assessing the impact of e-business on supply chain dynamics," International Journal of Production Economics, Elsevier, vol. 89(2), pages 109-118, May.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:118:y:2009:i:1:p:298-304. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.