Two machine scheduling subject to arbitrary machine availability constraint
Author
Abstract
Suggested Citation
DOI: 10.1016/j.omega.2017.05.004
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Huo, Yumei & Zhao, Hairong, 2015. "Total completion time minimization on multiple machines subject to machine availability and makespan constraints," European Journal of Operational Research, Elsevier, vol. 243(2), pages 547-554.
- Schmidt, Gunter, 2000. "Scheduling with limited machine availability," European Journal of Operational Research, Elsevier, vol. 121(1), pages 1-15, February.
- Chung-Yee Lee & Lei Lei & Michael Pinedo, 1997. "Current trends in deterministic scheduling," Annals of Operations Research, Springer, vol. 70(0), pages 1-41, April.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Basso, Franco & Guajardo, Mario & Varas, Mauricio, 2020. "Collaborative job scheduling in the wine bottling process," Omega, Elsevier, vol. 91(C).
- Sterna, Małgorzata, 2021. "Late and early work scheduling: A survey," Omega, Elsevier, vol. 104(C).
- Wang, Dujuan & Yin, Yunqiang & Cheng, T.C.E., 2018. "Parallel-machine rescheduling with job unavailability and rejection," Omega, Elsevier, vol. 81(C), pages 246-260.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Liao, Lu-Wen & Sheen, Gwo-Ji, 2008. "Parallel machine scheduling with machine availability and eligibility constraints," European Journal of Operational Research, Elsevier, vol. 184(2), pages 458-467, January.
- Yumei Huo, 2019. "Parallel machine makespan minimization subject to machine availability and total completion time constraints," Journal of Scheduling, Springer, vol. 22(4), pages 433-447, August.
- Liu, Peihai & Lu, Xiwen, 2016. "Integrated production and job delivery scheduling with an availability constraint," International Journal of Production Economics, Elsevier, vol. 176(C), pages 1-6.
- C.T. Ng & Mikhail Y. Kovalyov, 2004. "An FPTAS for scheduling a two‐machine flowshop with one unavailability interval," Naval Research Logistics (NRL), John Wiley & Sons, vol. 51(3), pages 307-315, April.
- J S Chen, 2006. "Single-machine scheduling with flexible and periodic maintenance," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 57(6), pages 703-710, June.
- Navid Hashemian & Claver Diallo & Béla Vizvári, 2014. "Makespan minimization for parallel machines scheduling with multiple availability constraints," Annals of Operations Research, Springer, vol. 213(1), pages 173-186, February.
- Yin, Yunqiang & Wang, Yan & Cheng, T.C.E. & Liu, Wenqi & Li, Jinhai, 2017. "Parallel-machine scheduling of deteriorating jobs with potential machine disruptions," Omega, Elsevier, vol. 69(C), pages 17-28.
- Mellouli, Racem & Sadfi, Chrif & Chu, Chengbin & Kacem, Imed, 2009. "Identical parallel-machine scheduling under availability constraints to minimize the sum of completion times," European Journal of Operational Research, Elsevier, vol. 197(3), pages 1150-1165, September.
- Huo, Yumei & Zhao, Hairong, 2015. "Total completion time minimization on multiple machines subject to machine availability and makespan constraints," European Journal of Operational Research, Elsevier, vol. 243(2), pages 547-554.
- Liao, Ching-Jong & Shyur, Der-Lin & Lin, Chien-Hung, 2005. "Makespan minimization for two parallel machines with an availability constraint," European Journal of Operational Research, Elsevier, vol. 160(2), pages 445-456, January.
- Xiuli Wang & T. C. Edwin Cheng, 2007. "Machine scheduling with an availability constraint and job delivery coordination," Naval Research Logistics (NRL), John Wiley & Sons, vol. 54(1), pages 11-20, February.
- Chen, Wen-Jinn, 2009. "Minimizing number of tardy jobs on a single machine subject to periodic maintenance," Omega, Elsevier, vol. 37(3), pages 591-599, June.
- Allaoui, H. & Artiba, A. & Elmaghraby, S.E. & Riane, F., 2006. "Scheduling of a two-machine flowshop with availability constraints on the first machine," International Journal of Production Economics, Elsevier, vol. 99(1-2), pages 16-27, February.
- Wang, Xiuli & Cheng, T.C.E., 2015. "A heuristic for scheduling jobs on two identical parallel machines with a machine availability constraint," International Journal of Production Economics, Elsevier, vol. 161(C), pages 74-82.
- Seyed Habib A. Rahmati & Abbas Ahmadi & Kannan Govindan, 2018. "A novel integrated condition-based maintenance and stochastic flexible job shop scheduling problem: simulation-based optimization approach," Annals of Operations Research, Springer, vol. 269(1), pages 583-621, October.
- Chen, Bo & Zhang, Xiandong, 2019. "Scheduling with time-of-use costs," European Journal of Operational Research, Elsevier, vol. 274(3), pages 900-908.
- Hongying Li & Chunjie Su, 2011. "An optimal semi-online algorithm for 2-machine scheduling with an availability constraint," Journal of Combinatorial Optimization, Springer, vol. 22(2), pages 153-165, August.
- T.C.E. Cheng & B.M.T. Lin & A. Toker, 2000. "Makespan minimization in the two‐machine flowshop batch scheduling problem," Naval Research Logistics (NRL), John Wiley & Sons, vol. 47(2), pages 128-144, March.
- Huang, Wei & Chen, Bo, 2007. "Scheduling of batch plants: Constraint-based approach and performance investigation," International Journal of Production Economics, Elsevier, vol. 105(2), pages 425-444, February.
- Hnaien, Faicel & Yalaoui, Farouk & Mhadhbi, Ahmed, 2015. "Makespan minimization on a two-machine flowshop with an availability constraint on the first machine," International Journal of Production Economics, Elsevier, vol. 164(C), pages 95-104.
More about this item
Keywords
Arbitrary availability constraint; Bi-criteria optimization; Optimal algorithms;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:jomega:v:76:y:2018:i:c:p:128-136. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/wps/find/journaldescription.cws_home/375/description#description .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.