IDEAS home Printed from https://ideas.repec.org/a/eee/ejores/v99y1997i2p289-302.html
   My bibliography  Save this article

A fuzzy multi-objective programming approach for optimal management of the reservoir watershed

Author

Listed:
  • Chang, Ni-Bin
  • Wen, C.G.
  • Chen, Y.L.

Abstract

No abstract is available for this item.

Suggested Citation

  • Chang, Ni-Bin & Wen, C.G. & Chen, Y.L., 1997. "A fuzzy multi-objective programming approach for optimal management of the reservoir watershed," European Journal of Operational Research, Elsevier, vol. 99(2), pages 289-302, June.
  • Handle: RePEc:eee:ejores:v:99:y:1997:i:2:p:289-302
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0377-2217(96)00019-7
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Wright, Jeffrey & Revelle, Charles & Cohon, Jared, 1983. "A multiobjective integer programming model for the land acquisition problem," Regional Science and Urban Economics, Elsevier, vol. 13(1), pages 31-53, February.
    2. Glover, Fred & Martinson, Fred, 1987. "Multiple-use land planning and conflict resolution by multiple objective linear programming," European Journal of Operational Research, Elsevier, vol. 28(3), pages 343-350, March.
    3. Chang, Ni-Bin & Wang, S.F., 1997. "A fuzzy goal programming approach for the optimal planning of metropolitan solid waste management systems," European Journal of Operational Research, Elsevier, vol. 99(2), pages 303-321, June.
    4. Julien, Benoit, 1994. "Water quality management with imprecise information," European Journal of Operational Research, Elsevier, vol. 76(1), pages 15-27, July.
    5. A. van Delft & P. Nijkamp, 1976. "A Multi‐Objective Decision Model For Regional Development, Environmental Quality Control, And Industrial Land Use," Papers in Regional Science, Wiley Blackwell, vol. 36(1), pages 35-58, January.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Wu, Chia-Chin & Chang, Ni-Bin, 2004. "Corporate optimal production planning with varying environmental costs: A grey compromise programming approach," European Journal of Operational Research, Elsevier, vol. 155(1), pages 68-95, May.
    2. Luhandjula, M.K. & Rangoaga, M.J., 2014. "An approach for solving a fuzzy multiobjective programming problem," European Journal of Operational Research, Elsevier, vol. 232(2), pages 249-255.
    3. Mohammad S. Roni & Sandra D. Eksioglu & Kara G. Cafferty & Jacob J. Jacobson, 2017. "A multi-objective, hub-and-spoke model to design and manage biofuel supply chains," Annals of Operations Research, Springer, vol. 249(1), pages 351-380, February.
    4. Stefan Hajkowicz & Kerry Collins, 2007. "A Review of Multiple Criteria Analysis for Water Resource Planning and Management," Water Resources Management: An International Journal, Published for the European Water Resources Association (EWRA), Springer;European Water Resources Association (EWRA), vol. 21(9), pages 1553-1566, September.
    5. Chen, Ho-Wen & Ning, Shu-Kuang & Yu, Ruey-Fang & Chen, Jeng-Chung, 2010. "Optimal safe groundwater yield for land conservation in a seashore area under uncertainty," Resources, Conservation & Recycling, Elsevier, vol. 54(8), pages 481-488.
    6. Aouni, Belaid & Kettani, Ossama, 2001. "Goal programming model: A glorious history and a promising future," European Journal of Operational Research, Elsevier, vol. 133(2), pages 225-231, January.
    7. Guoting Geng & Robin Wardlaw, 2013. "Application of Multi-Criterion Decision Making Analysis to Integrated Water Resources Management," Water Resources Management: An International Journal, Published for the European Water Resources Association (EWRA), Springer;European Water Resources Association (EWRA), vol. 27(8), pages 3191-3207, June.
    8. Prawat Sahakij & Steven Gabriel & Mark Ramirez & Chris Peot, 2011. "Multi-objective Optimization Models for Distributing Biosolids to Reuse Fields: A Case Study for the Blue Plains Wastewater Treatment Plant," Networks and Spatial Economics, Springer, vol. 11(1), pages 1-22, March.
    9. Moradi, Sohrab & Limaei, Soleiman Mohammadi, 2018. "Multi-objective game theory model and fuzzy programing approach for sustainable watershed management," Land Use Policy, Elsevier, vol. 71(C), pages 363-371.
    10. Lijing Wang & Wei Meng & Huaicheng Guo & Zhenxing Zhang & Yong Liu & Yingying Fan, 2006. "An Interval Fuzzy Multiobjective Watershed Management Model for the Lake Qionghai Watershed, China," Water Resources Management: An International Journal, Published for the European Water Resources Association (EWRA), Springer;European Water Resources Association (EWRA), vol. 20(5), pages 701-721, October.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Moradi, Sohrab & Limaei, Soleiman Mohammadi, 2018. "Multi-objective game theory model and fuzzy programing approach for sustainable watershed management," Land Use Policy, Elsevier, vol. 71(C), pages 363-371.
    2. S A Gabriel & P Sahakij & M Ramirez & C Peot, 2007. "A multiobjective optimization model for processing and distributing biosolids to reuse fields," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 58(7), pages 850-864, July.
    3. Chenhao Zhu & Jonah Susskind & Mario Giampieri & Hazel Backus O’Neil & Alan M. Berger, 2023. "Optimizing Sustainable Suburban Expansion with Autonomous Mobility through a Parametric Design Framework," Land, MDPI, vol. 12(9), pages 1-31, September.
    4. Michael Johnson & David Turcotte & Felicia Sullivan, 2010. "What Foreclosed Homes Should a Municipality Purchase to Stabilize Vulnerable Neighborhoods?," Networks and Spatial Economics, Springer, vol. 10(3), pages 363-388, September.
    5. Aouni, Belaid & Kettani, Ossama, 2001. "Goal programming model: A glorious history and a promising future," European Journal of Operational Research, Elsevier, vol. 133(2), pages 225-231, January.
    6. M Tavana & M A Sodenkamp, 2010. "A fuzzy multi-criteria decision analysis model for advanced technology assessment at Kennedy Space Center," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 61(10), pages 1459-1470, October.
    7. Prawat Sahakij & Steven Gabriel & Mark Ramirez & Chris Peot, 2011. "Multi-objective Optimization Models for Distributing Biosolids to Reuse Fields: A Case Study for the Blue Plains Wastewater Treatment Plant," Networks and Spatial Economics, Springer, vol. 11(1), pages 1-22, March.
    8. Zhou, Feng & Huang, Gordon H. & Chen, Guo-Xian & Guo, Huai-Cheng, 2009. "Enhanced-interval linear programming," European Journal of Operational Research, Elsevier, vol. 199(2), pages 323-333, December.
    9. Oléron-Evans, Thomas P. & Salhab, Melda, 2021. "Optimal land use allocation for the Heathrow opportunity area using multi-objective linear programming," Land Use Policy, Elsevier, vol. 105(C).
    10. Xu, Y. & Huang, G.H. & Qin, X.S. & Cao, M.F., 2009. "SRCCP: A stochastic robust chance-constrained programming model for municipal solid waste management under uncertainty," Resources, Conservation & Recycling, Elsevier, vol. 53(6), pages 352-363.
    11. Daniel, S. E. & Diakoulaki, D. C. & Pappis, C. P., 1997. "Operations research and environmental planning," European Journal of Operational Research, Elsevier, vol. 102(2), pages 248-263, October.
    12. Chen, C. & Li, Y.P. & Huang, G.H., 2016. "Interval-fuzzy municipal-scale energy model for identification of optimal strategies for energy management – A case study of Tianjin, China," Renewable Energy, Elsevier, vol. 86(C), pages 1161-1177.
    13. Senay Oguztimur, 2011. "Why Fuzzy Analytic Hierarchy Process Approach For Transport Problems?," ERSA conference papers ersa11p438, European Regional Science Association.
    14. Li, Y.P. & Huang, G.H. & Wang, G.Q. & Huang, Y.F., 2009. "FSWM: A hybrid fuzzy-stochastic water-management model for agricultural sustainability under uncertainty," Agricultural Water Management, Elsevier, vol. 96(12), pages 1807-1818, December.
    15. Di Corato, Luca & Montinari, Natalia, 2014. "Flexible waste management under uncertainty," European Journal of Operational Research, Elsevier, vol. 234(1), pages 174-185.
    16. Afsana Haque & Yasushi Asami, 2011. "Optimizing Urban Land-Use Allocation: Case Study of Dhanmondi Residential Area, Dhaka, Bangladesh," Environment and Planning B, , vol. 38(3), pages 388-410, June.
    17. Li, Y.P. & Huang, G.H. & Yang, Z.F. & Nie, S.L., 2008. "IFMP: Interval-fuzzy multistage programming for water resources management under uncertainty," Resources, Conservation & Recycling, Elsevier, vol. 52(5), pages 800-812.
    18. Chen, Chang-Chih & Shyu, So-De & Wu, Yen-Chun & Yang, Chih-Yuan, 2011. "A waste management model for optimal recycling-landfilling policies under macroeconomic conditions," Economic Modelling, Elsevier, vol. 28(3), pages 852-858, May.
    19. Mishra, SK, 2008. "On construction of robust composite indices by linear aggregation," MPRA Paper 9232, University Library of Munich, Germany.
    20. J T Diamond & J R Wright, 1988. "Design of an Integrated Spatial Information System for Multiobjective Land-Use Planning," Environment and Planning B, , vol. 15(2), pages 205-214, June.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:99:y:1997:i:2:p:289-302. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.