An inventory system with demand dependent on both time and price assuming backlogged shortages
Author
Abstract
Suggested Citation
DOI: 10.1016/j.ejor.2017.10.042
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Hauck, Zsuzsanna & Rabta, Boualem & Reiner, Gerald, 2021. "Joint quality and pricing decisions in lot sizing models with defective items," International Journal of Production Economics, Elsevier, vol. 241(C).
- Nobil, Erfan & Cárdenas-Barrón, Leopoldo Eduardo & Garza-Núñez, Dagoberto & Treviño-Garza, Gerardo & Céspedes-Mota, Armando & Loera-Hernández, Imelda de Jesús & Smith, Neale R. & Nobil, Amir Hossein, 2024. "Sustainability inventory management model with warm-up process and shortage," Operations Research Perspectives, Elsevier, vol. 12(C).
- San-José, Luis A. & Sicilia, Joaquín & Cárdenas-Barrón, Leopoldo Eduardo & González-de-la-Rosa, Manuel, 2024. "A sustainable inventory model for deteriorating items with power demand and full backlogging under a carbon emission tax," International Journal of Production Economics, Elsevier, vol. 268(C).
- Khan, Md. Al-Amin & Cárdenas-Barrón, Leopoldo Eduardo & Treviño-Garza, Gerardo & Céspedes-Mota, Armando, 2023. "Installment for advance payment and pricing decisions for an inventory system under power demand pattern and all-units discount," International Journal of Production Economics, Elsevier, vol. 265(C).
- Sweety Gupta & Vinod Kumar Mishra, 2024. "Multi-item stochastic inventory model for deteriorating items with power demand pattern under partial backlogging and joint replenishment," Annals of Operations Research, Springer, vol. 341(2), pages 963-991, October.
- Cynthia Griselle De-la-Cruz-Márquez & Leopoldo Eduardo Cárdenas-Barrón & J. David Porter & Imelda de Jesús Loera-Hernández & Neale R. Smith & Armando Céspedes-Mota & Gerardo Treviño-Garza & Rafael Ern, 2023. "An Inventory Model for Growing Items When the Demand Is Price Sensitive with Imperfect Quality, Inspection Errors, Carbon Emissions, and Planned Backorders," Mathematics, MDPI, vol. 11(21), pages 1-45, October.
- Terzi, Mourad & Ouazene, Yassine & Yalaoui, Alice & Yalaoui, Farouk, 2023. "Lot-sizing and pricing decisions under attraction demand models and multi-channel environment: New efficient formulations," Operations Research Perspectives, Elsevier, vol. 10(C).
- Luis A. San-José & Joaquín Sicilia & Manuel González-de-la-Rosa & Jaime Febles-Acosta, 2022. "Profit maximization in an inventory system with time-varying demand, partial backordering and discrete inventory cycle," Annals of Operations Research, Springer, vol. 316(2), pages 763-783, September.
- Su, Rung-Hung & Weng, Ming-Wei & Yang, Chih-Te, 2021. "Effects of corporate social responsibility activities in a two-stage assembly production system with multiple components and imperfect processes," European Journal of Operational Research, Elsevier, vol. 293(2), pages 469-480.
- Khan, Md. Al-Amin & Cárdenas-Barrón, Leopoldo Eduardo & Treviño-Garza, Gerardo & Céspedes-Mota, Armando & Loera-Hernández, Imelda de Jesús & Smith, Neale R., 2024. "Effects of variable prepayment installments on pricing and inventory decisions with power demand pattern and non-linear holding cost under carbon cap-and-price regulation," Operations Research Perspectives, Elsevier, vol. 12(C).
- Chernonog, Tatyana, 2020. "Inventory and marketing policy in a supply chain of a perishable product," International Journal of Production Economics, Elsevier, vol. 219(C), pages 259-274.
More about this item
Keywords
Inventory; Price and time-dependent demand; Backlogged demand; Profit optimization;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:270:y:2018:i:3:p:889-897. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.