IDEAS home Printed from https://ideas.repec.org/a/eee/ejores/v253y2016i2p383-391.html
   My bibliography  Save this article

Optimal production planning for assembly systems with uncertain capacities and random demandAuthor-Name: Ji, Qingkai

Author

Listed:
  • Wang, Yunzeng
  • Hu, Xiangpei

Abstract

We study the optimal production planning for an assembly system consisting of n components in a single period setting. Demand for the end-product is random and production and assembly capacities are uncertain due to unexpected breakdowns, repairs and reworks, etc. The cost-minimizing firm (she) plans components production before the production capacities are realized, and after the outputs of components are observed, she decides the assembly amount before the demand realization. We start with a simplified system of selling two complementary products without an assembly stage and find that the firm's best choices can only be: (a) producing no products or producing only the product of less stock such that its target amount is not higher than the other product's initial stock level, or (b) producing both products such that their target amounts are equal. Leveraging on these findings, the two-dimensional optimization problem is reduced to two single-dimensional sub-problems and the optimal solution is characterized. For a general assembly system with n components, we show that if initially the firm has more end-products than a certain level, she will neither produce any component nor assemble end-product; if she does not have that many end-products but does have enough mated components, she will produce nothing and assemble up to that level; otherwise she will try to assemble all mated components and plan production of components accordingly. We characterize the structure of optimal solutions and find the solutions analytically.

Suggested Citation

  • Wang, Yunzeng & Hu, Xiangpei, 2016. "Optimal production planning for assembly systems with uncertain capacities and random demandAuthor-Name: Ji, Qingkai," European Journal of Operational Research, Elsevier, vol. 253(2), pages 383-391.
  • Handle: RePEc:eee:ejores:v:253:y:2016:i:2:p:383-391
    DOI: 10.1016/j.ejor.2016.02.021
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0377221716300583
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.ejor.2016.02.021?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Li, Yanhai & Ou, Jinwen, 2022. "Replenishment decisions for complementary components with supply capacity uncertainty under the CVaR criterion," European Journal of Operational Research, Elsevier, vol. 297(3), pages 904-916.
    2. Amirmohsen Golmohammadi & Alireza Tajbakhsh & Mohamed Dia & Pawoumodom M. Takouda, 2022. "Effect of timing on reliability improvement and ordering decisions in a decentralized assembly system," Annals of Operations Research, Springer, vol. 312(1), pages 159-192, May.
    3. Heydari, Jafar & Govindan, Kannan & Sadeghi, Razieh, 2018. "Reverse supply chain coordination under stochastic remanufacturing capacity," International Journal of Production Economics, Elsevier, vol. 202(C), pages 1-11.
    4. Qi Feng & Zhongjie Ma & Zhaofang Mao & J. George Shanthikumar, 2021. "Multiā€Stage Supply Chain with Production Uncertainty," Production and Operations Management, Production and Operations Management Society, vol. 30(4), pages 921-940, April.
    5. Li, Bo & Arreola-Risa, Antonio, 2017. "Financial risk, inventory decision and process improvement for a firm with random capacity," European Journal of Operational Research, Elsevier, vol. 260(1), pages 183-194.
    6. Qi Feng & J. George Shanthikumar, 2022. "Applications of Stochastic Orders and Stochastic Functions in Inventory and Pricing Problems," Production and Operations Management, Production and Operations Management Society, vol. 31(4), pages 1433-1453, April.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:253:y:2016:i:2:p:383-391. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.