Optimal selection of project portfolios using reinvestment strategy within a flexible time horizon
Author
Abstract
Suggested Citation
DOI: 10.1016/j.ejor.2014.12.013
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Harry Markowitz, 1952. "Portfolio Selection," Journal of Finance, American Finance Association, vol. 7(1), pages 77-91, March.
- Lockett, Geoff & Stratford, Mike, 1987. "Ranking of research projects: Experiments with two methods," Omega, Elsevier, vol. 15(5), pages 395-400.
- F Ghasemzadeh & N Archer & P Iyogun, 1999. "A zero-one model for project portfolio selection and scheduling," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 50(7), pages 745-755, July.
- Clifford C. Petersen, 1967. "Computational Experience with Variants of the Balas Algorithm Applied to the Selection of R&D Projects," Management Science, INFORMS, vol. 13(9), pages 736-750, May.
- Regan, Peter J. & Holtzman, Samuel, 1995. "R&D Decision Advisor: An interactive approach to normative decision system model construction," European Journal of Operational Research, Elsevier, vol. 84(1), pages 116-133, July.
- Medaglia, Andres L. & Graves, Samuel B. & Ringuest, Jeffrey L., 2007. "A multiobjective evolutionary approach for linearly constrained project selection under uncertainty," European Journal of Operational Research, Elsevier, vol. 179(3), pages 869-894, June.
- Gregory, Christine & Darby-Dowman, Ken & Mitra, Gautam, 2011. "Robust optimization and portfolio selection: The cost of robustness," European Journal of Operational Research, Elsevier, vol. 212(2), pages 417-428, July.
- Mansini, Renata & Ogryczak, Wlodzimierz & Speranza, M. Grazia, 2014. "Twenty years of linear programming based portfolio optimization," European Journal of Operational Research, Elsevier, vol. 234(2), pages 518-535.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Pérez Odeh, Rodrigo & Watts, David & Negrete-Pincetic, Matías, 2018. "Portfolio applications in electricity markets review: Private investor and manager perspective trends," Renewable and Sustainable Energy Reviews, Elsevier, vol. 81(P1), pages 192-204.
- Roychaudhuri, Pritam Sankar & Kazantzi, Vasiliki & Foo, Dominic C.Y. & Tan, Raymond R. & Bandyopadhyay, Santanu, 2017. "Selection of energy conservation projects through Financial Pinch Analysis," Energy, Elsevier, vol. 138(C), pages 602-615.
- Pérez, Fátima & Gómez, Trinidad & Caballero, Rafael & Liern, Vicente, 2018. "Project portfolio selection and planning with fuzzy constraints," Technological Forecasting and Social Change, Elsevier, vol. 131(C), pages 117-129.
- Khalifa Mohammed Al-Sobai & Shaligram Pokharel & Galal M. Abdella, 2020. "Perspectives on the Capabilities for the Selection of Strategic Projects," Sustainability, MDPI, vol. 12(19), pages 1-20, October.
- Ran Etgar & Yuval Cohen, 2022. "Roadmap Optimization: Multi-Annual Project Portfolio Selection Method," Mathematics, MDPI, vol. 10(9), pages 1-23, May.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Kobayashi, Ken & Takano, Yuichi & Nakata, Kazuhide, 2023. "Cardinality-constrained distributionally robust portfolio optimization," European Journal of Operational Research, Elsevier, vol. 309(3), pages 1173-1182.
- Xidonas, Panos & Mavrotas, George & Hassapis, Christis & Zopounidis, Constantin, 2017. "Robust multiobjective portfolio optimization: A minimax regret approach," European Journal of Operational Research, Elsevier, vol. 262(1), pages 299-305.
- Dey, Prasanta Kumar, 2006. "Integrated project evaluation and selection using multiple-attribute decision-making technique," International Journal of Production Economics, Elsevier, vol. 103(1), pages 90-103, September.
- Juan F. Monge & Mercedes Landete & Jos'e L. Ruiz, 2016. "Sharpe portfolio using a cross-efficiency evaluation," Papers 1610.00937, arXiv.org, revised Oct 2016.
- Tamiz, Mehrdad & Azmi, Rania A. & Jones, Dylan F., 2013. "On selecting portfolio of international mutual funds using goal programming with extended factors," European Journal of Operational Research, Elsevier, vol. 226(3), pages 560-576.
- Kolm, Petter N. & Tütüncü, Reha & Fabozzi, Frank J., 2014. "60 Years of portfolio optimization: Practical challenges and current trends," European Journal of Operational Research, Elsevier, vol. 234(2), pages 356-371.
- Mitter, Hermine & Heumesser, Christine & Schmid, Erwin, 2014. "Modelling robust crop production portfolios to assess agricultural vulnerability to climate change," 2014 International Congress, August 26-29, 2014, Ljubljana, Slovenia 182702, European Association of Agricultural Economists.
- Gatfaoui, Hayette, 2019.
"Diversifying portfolios of U.S. stocks with crude oil and natural gas: A regime-dependent optimization with several risk measures,"
Energy Economics, Elsevier, vol. 80(C), pages 132-152.
- Hayette Gatfaoui, 2018. "Diversifying portfolios of U.S. stocks with crude oil and natural gas: A regime-dependent optimization with several risk measures," Papers 1811.02382, arXiv.org.
- Hayette Gatfaoui, 2019. "Diversifying portfolios of U.S. stocks with crude oil and natural gas: A regime-dependent optimization with several risk measures," Post-Print hal-02115626, HAL.
- Xidonas, Panos & Hassapis, Christis & Soulis, John & Samitas, Aristeidis, 2017. "Robust minimum variance portfolio optimization modelling under scenario uncertainty," Economic Modelling, Elsevier, vol. 64(C), pages 60-71.
- Hosseini-Nodeh, Zohreh & Khanjani-Shiraz, Rashed & Pardalos, Panos M., 2023. "Portfolio optimization using robust mean absolute deviation model: Wasserstein metric approach," Finance Research Letters, Elsevier, vol. 54(C).
- Zhao, Daping & Bai, Lin & Fang, Yong & Wang, Shouyang, 2022. "Multi‐period portfolio selection with investor views based on scenario tree," Applied Mathematics and Computation, Elsevier, vol. 418(C).
- Pérez, Fátima & Gómez, Trinidad & Caballero, Rafael & Liern, Vicente, 2018. "Project portfolio selection and planning with fuzzy constraints," Technological Forecasting and Social Change, Elsevier, vol. 131(C), pages 117-129.
- P. Kumar & Jyotirmayee Behera & A. K. Bhurjee, 2022. "Solving mean-VaR portfolio selection model with interval-typed random parameter using interval analysis," OPSEARCH, Springer;Operational Research Society of India, vol. 59(1), pages 41-77, March.
- Ahmadi-Javid, Amir & Fallah-Tafti, Malihe, 2019. "Portfolio optimization with entropic value-at-risk," European Journal of Operational Research, Elsevier, vol. 279(1), pages 225-241.
- Selim Mankai & Khaled Guesmi, 2014. "Robust Portfolio Protection: A Scenarios-Based Approach," Working Papers hal-04141326, HAL.
- Gatzert, Nadine & Martin, Alexander & Schmidt, Martin & Seith, Benjamin & Vogl, Nikolai, 2021. "Portfolio optimization with irreversible long-term investments in renewable energy under policy risk: A mixed-integer multistage stochastic model and a moving-horizon approach," European Journal of Operational Research, Elsevier, vol. 290(2), pages 734-748.
- Kerstens, Kristiaan & Mazza, Paolo & Ren, Tiantian & Van de Woestyne, Ignace, 2022.
"Multi-Time and Multi-Moment Nonparametric Frontier-Based Fund Rating: Proposal and Buy-and-Hold Backtesting Strategy,"
Omega, Elsevier, vol. 113(C).
- Kristiaan Kerstens & Paolo Mazza & Tiantian Ren & Ignace Van de Woestyne, 2021. "Multi-Time and Multi-Moment Nonparametric Frontier-Based Fund Rating: Proposal and Buy-and-Hold Backtesting Strategy," Working Papers 2021-EQM-03, IESEG School of Management.
- Kristiaan Kerstens & Paolo Mazza & Tiantian Ren & Ignace van de Woestyne, 2022. "Multi-Time and Multi-Moment Nonparametric Frontier-Based Fund Rating: Proposal and Buy-and-Hold Backtesting Strategy," Post-Print hal-03833261, HAL.
- Yam, Sheung Chi Phillip & Yang, Hailiang & Yuen, Fei Lung, 2016. "Optimal asset allocation: Risk and information uncertainty," European Journal of Operational Research, Elsevier, vol. 251(2), pages 554-561.
- R?zvan C?t?lin DOBREA & Felicia Alina DINU, 2014. "A Build-Up Algorithm For Sustainable Discount Rates Projections," Proceedings of the INTERNATIONAL MANAGEMENT CONFERENCE, Faculty of Management, Academy of Economic Studies, Bucharest, Romania, vol. 8(1), pages 1181-1191, November.
- António Alberto Santos & Ana Margarida Monteiro & Rui Pascoal, 2014. "Portfolio Choice under Parameter Uncertainty: Bayesian Analysis and Robust Optimization Comparison," GEMF Working Papers 2014-25, GEMF, Faculty of Economics, University of Coimbra.
More about this item
Keywords
Project management; Project portfolio selection; Project scheduling; Integer programming;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:243:y:2015:i:2:p:658-664. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.