Statistical performance of a multiclass bulk production queueing system
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Raman K. Nurani & Sridhar Seshadri & J. George Shanthikumar, 1997. "Optimal Control of a Single Stage Production System Subject to Random Process Shifts," Operations Research, INFORMS, vol. 45(5), pages 713-724, October.
- Cordon, Carlos, 1995. "Quality defaults and work-in-process inventory," European Journal of Operational Research, Elsevier, vol. 80(2), pages 240-251, January.
- C. Armero & D. Conesa, 1998. "Inference and prediction in bulk arrival queues and queues with service in stages," Applied Stochastic Models and Data Analysis, John Wiley & Sons, vol. 14(1), pages 35-46, March.
- Yu-Sheng Zheng & Paul Zipkin, 1990. "A Queueing Model to Analyze the Value of Centralized Inventory Information," Operations Research, INFORMS, vol. 38(2), pages 296-307, April.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Musal, R. Muzaffer & Soyer, Refik & McCabe, Christopher & Kharroubi, Samer A., 2012. "Estimating the population utility function: A parametric Bayesian approach," European Journal of Operational Research, Elsevier, vol. 218(2), pages 538-547.
- M. A. C. Almeida & F. R. B. Cruz & F. L. P. Oliveira & G. Souza, 2020. "Bias correction for estimation of performance measures of a Markovian queue," Operational Research, Springer, vol. 20(2), pages 943-958, June.
- Singh, Saroja Kumar & Acharya, Sarat Kumar & Cruz, F.R.B. & Cançado, André L.F., 2023. "Change point estimation in an M/M/2 queue with heterogeneous servers," Mathematics and Computers in Simulation (MATCOM), Elsevier, vol. 212(C), pages 182-194.
- Kahraman, Aykut & Gosavi, Abhijit, 2011. "On the distribution of the number stranded in bulk-arrival, bulk-service queues of the M/G/1 form," European Journal of Operational Research, Elsevier, vol. 212(2), pages 352-360, July.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Albert Y. Ha, 2000. "Stock Rationing in an M/E k /1 Make-to-Stock Queue," Management Science, INFORMS, vol. 46(1), pages 77-87, January.
- Dimitris Bertsimas & Ioannis Ch. Paschalidis, 2001. "Probabilistic Service Level Guarantees in Make-to-Stock Manufacturing Systems," Operations Research, INFORMS, vol. 49(1), pages 119-133, February.
- repec:cte:wsrepe:ws014126 is not listed on IDEAS
- Ananth. V. Iyer, 2002. "Inventory cost impact of order processing priorities based on demand uncertainty," Naval Research Logistics (NRL), John Wiley & Sons, vol. 49(4), pages 376-390, June.
- Ioannis Ch. Paschalidis & Yong Liu, 2003. "Large Deviations-Based Asymptotics for Inventory Control in Supply Chains," Operations Research, INFORMS, vol. 51(3), pages 437-460, June.
- Bora Kat & Zeynep Avṣar, 2011. "Using aggregate fill rate for dynamic scheduling of multi-class systems," Annals of Operations Research, Springer, vol. 182(1), pages 87-117, January.
- Yucesan, Enver & de Groote, Xavier, 2000. "Lead times, order release mechanisms, and customer service," European Journal of Operational Research, Elsevier, vol. 120(1), pages 118-130, January.
- Francis De Vericourt & Fikri Karaesmen & Yves Dallery, 2000. "Dynamic Scheduling in a Make-to-Stock System: A Partial Characterization of Optimal Policies," Operations Research, INFORMS, vol. 48(5), pages 811-819, October.
- M. A. C. Almeida & F. R. B. Cruz & F. L. P. Oliveira & G. Souza, 2020. "Bias correction for estimation of performance measures of a Markovian queue," Operational Research, Springer, vol. 20(2), pages 943-958, June.
- David M. Markowitz & Lawrence M. Wein, 2001. "Heavy Traffic Analysis of Dynamic Cyclic Policies: A Unified Treatment of the Single Machine Scheduling Problem," Operations Research, INFORMS, vol. 49(2), pages 246-270, April.
- Arreola-Risa, Antonio, 1996. "Integrated multi-item production-inventory systems," European Journal of Operational Research, Elsevier, vol. 89(2), pages 326-340, March.
- Arreola-Risa, Antonio & Giménez-García, Víctor M. & Martínez-Parra, José Luis, 2011. "Optimizing stochastic production-inventory systems: A heuristic based on simulation and regression analysis," European Journal of Operational Research, Elsevier, vol. 213(1), pages 107-118, August.
- Ananth V. Iyer & Apurva Jain, 2004. "Modeling the Impact of Merging Capacity in Production-Inventory Systems," Management Science, INFORMS, vol. 50(8), pages 1082-1094, August.
- Saif Benjaafar & Yanzhi Li & Dongsheng Xu & Samir Elhedhli, 2008. "Demand Allocation in Systems with Multiple Inventory Locations and Multiple Demand Sources," Manufacturing & Service Operations Management, INFORMS, vol. 10(1), pages 43-60, October.
- Zhang, Zhongju & Fan, Weiguo, 2008. "Web server load balancing: A queueing analysis," European Journal of Operational Research, Elsevier, vol. 186(2), pages 681-693, April.
- Hossein Abouee-Mehrizi & Opher Baron & Oded Berman, 2014. "Exact Analysis of Capacitated Two-Echelon Inventory Systems with Priorities," Manufacturing & Service Operations Management, INFORMS, vol. 16(4), pages 561-577, October.
- Caldentey, René. & Wein, Lawrence M., 1999. "Analysis of decentralized production-inventory system," Working papers WP 4099-99., Massachusetts Institute of Technology (MIT), Sloan School of Management.
- Li, Xiuhui & Wang, Qinan, 2007. "Coordination mechanisms of supply chain systems," European Journal of Operational Research, Elsevier, vol. 179(1), pages 1-16, May.
- R.E. Lillo, 2001. "Optimal control of an M/G/1 queue with impatient priority customers," Naval Research Logistics (NRL), John Wiley & Sons, vol. 48(3), pages 201-209, April.
- Vickson, Raymond G. & Hassini, Elkafi, 2006. "Lot streaming for quality control in two-stage batch production," European Journal of Operational Research, Elsevier, vol. 170(3), pages 824-843, May.
- William Liang & Barış Balcıog̃lu & Robert Svaluto, 2013. "Scheduling policies for a repair shop problem," Annals of Operations Research, Springer, vol. 211(1), pages 273-288, December.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:158:y:2004:i:3:p:649-661. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.