Preemptive scheduling on identical parallel machines subject to deadlines
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Lee A. Herrbach & Joseph Y.-T. Leung, 1990. "Preemptive Scheduling of Equal Length Jobs on Two Machines to Minimize Mean Flow Time," Operations Research, INFORMS, vol. 38(3), pages 487-494, June.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Jiang, Xiaojuan & Lee, Kangbok & Pinedo, Michael L., 2021. "Ideal schedules in parallel machine settings," European Journal of Operational Research, Elsevier, vol. 290(2), pages 422-434.
- Lushchakova, Irina N., 2012. "Preemptive scheduling of two uniform parallel machines to minimize total tardiness," European Journal of Operational Research, Elsevier, vol. 219(1), pages 27-33.
- Lushchakova, Irene N., 2006. "Two machine preemptive scheduling problem with release dates, equal processing times and precedence constraints," European Journal of Operational Research, Elsevier, vol. 171(1), pages 107-122, May.
- Bo Chen & Ed Coffman & Dariusz Dereniowski & Wiesław Kubiak, 2016. "Normal-form preemption sequences for an open problem in scheduling theory," Journal of Scheduling, Springer, vol. 19(6), pages 701-728, December.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:148:y:2003:i:1:p:205-210. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.