IDEAS home Printed from https://ideas.repec.org/a/eee/ejores/v129y2001i1p224-229.html
   My bibliography  Save this article

A note on scheduling flowshops with flexible stage ordering

Author

Listed:
  • Koulamas, Christos
  • Kyparisis, George J.

Abstract

No abstract is available for this item.

Suggested Citation

  • Koulamas, Christos & Kyparisis, George J., 2001. "A note on scheduling flowshops with flexible stage ordering," European Journal of Operational Research, Elsevier, vol. 129(1), pages 224-229, February.
  • Handle: RePEc:eee:ejores:v:129:y:2001:i:1:p:224-229
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0377-2217(99)00430-0
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Teofilo Gonzalez & Sartaj Sahni, 1978. "Flowshop and Jobshop Schedules: Complexity and Approximation," Operations Research, INFORMS, vol. 26(1), pages 36-52, February.
    2. Hau L. Lee & Christopher S. Tang, 1998. "Variability Reduction Through Operations Reversal," Management Science, INFORMS, vol. 44(2), pages 162-172, February.
    3. Koulamas, Christos, 1998. "A new constructive heuristic for the flowshop scheduling problem," European Journal of Operational Research, Elsevier, vol. 105(1), pages 66-71, February.
    4. Ramalhinho Lourenco, Helena, 1996. "Sevast'yanov's algorithm for the flow-shop scheduling problem," European Journal of Operational Research, Elsevier, vol. 91(1), pages 176-189, May.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Gupta, Jatinder N.D. & Koulamas, Christos & Kyparisis, George J., 2006. "Performance guarantees for flowshop heuristics to minimize makespan," European Journal of Operational Research, Elsevier, vol. 169(3), pages 865-872, March.
    2. Kalczynski, Pawel Jan & Kamburowski, Jerzy, 2007. "On the NEH heuristic for minimizing the makespan in permutation flow shops," Omega, Elsevier, vol. 35(1), pages 53-60, February.
    3. Benavides, Alexander J. & Ritt, Marcus & Miralles, Cristóbal, 2014. "Flow shop scheduling with heterogeneous workers," European Journal of Operational Research, Elsevier, vol. 237(2), pages 713-720.
    4. Nikhil Jain & Anand Paul, 2001. "A Generalized Model of Operations Reversal for Fashion Goods," Management Science, INFORMS, vol. 47(4), pages 595-600, April.
    5. Işık Biçer & Florian Lücker & Tamer Boyacı, 2022. "Beyond Retail Stores: Managing Product Proliferation along the Supply Chain," Production and Operations Management, Production and Operations Management Society, vol. 31(3), pages 1135-1156, March.
    6. Fay, Scott & Mitra, Deb & Wang, Qiong, 2009. "Ask or infer? Strategic implications of alternative learning approaches in customization," International Journal of Research in Marketing, Elsevier, vol. 26(2), pages 136-152.
    7. Wu, Chin-Chia & Lee, Wen-Chiung, 2006. "Two-machine flowshop scheduling to minimize mean flow time under linear deterioration," International Journal of Production Economics, Elsevier, vol. 103(2), pages 572-584, October.
    8. Kyparisis, George J. & Koulamas, Christos, 2000. "Flow shop and open shop scheduling with a critical machine and two operations per job," European Journal of Operational Research, Elsevier, vol. 127(1), pages 120-125, November.
    9. Pan, Quan-Ke & Ruiz, Rubén, 2012. "Local search methods for the flowshop scheduling problem with flowtime minimization," European Journal of Operational Research, Elsevier, vol. 222(1), pages 31-43.
    10. S.S. Panwalkar & Christos Koulamas, 2015. "Proportionate flow shop: New complexity results and models with due date assignment," Naval Research Logistics (NRL), John Wiley & Sons, vol. 62(2), pages 98-106, March.
    11. Gerardo Minella & Rubén Ruiz & Michele Ciavotta, 2008. "A Review and Evaluation of Multiobjective Algorithms for the Flowshop Scheduling Problem," INFORMS Journal on Computing, INFORMS, vol. 20(3), pages 451-471, August.
    12. C N Potts & V A Strusevich, 2009. "Fifty years of scheduling: a survey of milestones," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 60(1), pages 41-68, May.
    13. Biskup, Dirk, 2008. "A state-of-the-art review on scheduling with learning effects," European Journal of Operational Research, Elsevier, vol. 188(2), pages 315-329, July.
    14. T.C.E. Cheng & B.M.T. Lin & A. Toker, 2000. "Makespan minimization in the two‐machine flowshop batch scheduling problem," Naval Research Logistics (NRL), John Wiley & Sons, vol. 47(2), pages 128-144, March.
    15. D Bai & L Tang, 2010. "New heuristics for flow shop problem to minimize makespan," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 61(6), pages 1032-1040, June.
    16. Gilbert, Stephen M. & Cvsa, Viswanath, 2003. "Strategic commitment to price to stimulate downstream innovation in a supply chain," European Journal of Operational Research, Elsevier, vol. 150(3), pages 617-639, November.
    17. Kai Huang, 2014. "Benchmarking non-first-come-first-served component allocation in an assemble-to-order system," Annals of Operations Research, Springer, vol. 223(1), pages 217-237, December.
    18. A Allahverdi & F S Al-Anzi, 2006. "Scheduling multi-stage parallel-processor services to minimize average response time," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 57(1), pages 101-110, January.
    19. Jain, A. S. & Meeran, S., 1999. "Deterministic job-shop scheduling: Past, present and future," European Journal of Operational Research, Elsevier, vol. 113(2), pages 390-434, March.
    20. Hirofumi Matsuo, 1990. "Cyclic sequencing problems in the two‐machine permutation flow shop: Complexity, worst‐case, and average‐case analysis," Naval Research Logistics (NRL), John Wiley & Sons, vol. 37(5), pages 679-694, October.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:129:y:2001:i:1:p:224-229. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.