IDEAS home Printed from https://ideas.repec.org/a/eee/ecmode/v29y2012i6p2274-2282.html
   My bibliography  Save this article

Optimal replenishment order for uncertain demand in three layer supply chain

Author

Listed:
  • Roy, Arpita
  • Sana, Shib Sankar
  • Chaudhuri, Kripasindhu

Abstract

The authors study the well-known order quantity model in a three-player context, using a framework of newsboy problem. An expected average cost function of the chain by trading off inventory cost and shortage costs is formulated which is minimized to obtain optimal order sizes of the supplier, manufacturer and retailer. Our theoretical analysis of both cases; (i) when demand per unit time of each member of the chain is uncertain, (ii) when uncertain demand is distributed uniformly over finite time horizon; suggests the determining of optimal order sizes of the members so that the expected average channel cost is minimum. Numerical examples for different distributions are illustrated to justify our model.

Suggested Citation

  • Roy, Arpita & Sana, Shib Sankar & Chaudhuri, Kripasindhu, 2012. "Optimal replenishment order for uncertain demand in three layer supply chain," Economic Modelling, Elsevier, vol. 29(6), pages 2274-2282.
  • Handle: RePEc:eee:ecmode:v:29:y:2012:i:6:p:2274-2282
    DOI: 10.1016/j.econmod.2012.07.008
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0264999312002295
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.econmod.2012.07.008?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Lu, Lu, 1995. "A one-vendor multi-buyer integrated inventory model," European Journal of Operational Research, Elsevier, vol. 81(2), pages 312-323, March.
    2. Chou, Yon-Chun & Chung, Hsien-Jung, 2009. "Service-based capacity strategy for manufacturing service duopoly of differentiated prices and lognormal random demand," International Journal of Production Economics, Elsevier, vol. 121(1), pages 162-175, September.
    3. Johansen, Soren Glud & Thorstenson, Anders, 1993. "Optimal and approximate (Q, r) inventory policies with lost sales and gamma-distributed lead time," International Journal of Production Economics, Elsevier, vol. 30(1), pages 179-194, July.
    4. Zhang, Guoqing, 2010. "The multi-product newsboy problem with supplier quantity discounts and a budget constraint," European Journal of Operational Research, Elsevier, vol. 206(2), pages 350-360, October.
    5. Khouja, Moutaz, 2003. "Optimizing inventory decisions in a multi-stage multi-customer supply chain," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 39(3), pages 193-208, May.
    6. Chen, Jing & Bell, Peter C., 2011. "Coordinating a decentralized supply chain with customer returns and price-dependent stochastic demand using a buyback policy," European Journal of Operational Research, Elsevier, vol. 212(2), pages 293-300, July.
    7. Cárdenas-Barrón, Leopoldo Eduardo, 2007. "Optimizing inventory decisions in a multi-stage multi-customer supply chain: A note," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 43(5), pages 647-654, September.
    8. Viswanathan, S. & Wang, Qinan, 2003. "Discount pricing decisions in distribution channels with price-sensitive demand," European Journal of Operational Research, Elsevier, vol. 149(3), pages 571-587, September.
    9. Hsieh, Chung-Chi & Lu, Yu-Ting, 2010. "Manufacturer's return policy in a two-stage supply chain with two risk-averse retailers and random demand," European Journal of Operational Research, Elsevier, vol. 207(1), pages 514-523, November.
    10. Chen, Liang-Hsuan & Chen, Ying-Che, 2010. "A multiple-item budget-constraint newsboy problem with a reservation policy," Omega, Elsevier, vol. 38(6), pages 431-439, December.
    11. Woo, York Y. & Hsu, Shu-Lu & Wu, Soushan, 2001. "An integrated inventory model for a single vendor and multiple buyers with ordering cost reduction," International Journal of Production Economics, Elsevier, vol. 73(3), pages 203-215, October.
    12. Goyal, S. K., 1995. "A one-vendor multi-buyer integrated inventory model: A comment," European Journal of Operational Research, Elsevier, vol. 82(1), pages 209-210, April.
    13. Matsuyama, Keisuke, 2006. "The multi-period newsboy problem," European Journal of Operational Research, Elsevier, vol. 171(1), pages 170-188, May.
    14. Lee, Chih-Ming & Hsu, Shu-Lu, 2011. "The effect of advertising on the distribution-free newsboy problem," International Journal of Production Economics, Elsevier, vol. 129(1), pages 217-224, January.
    15. Khouja, Moutaz, 1995. "The newsboy problem under progressive multiple discounts," European Journal of Operational Research, Elsevier, vol. 84(2), pages 458-466, July.
    16. Thomas, Douglas J. & Griffin, Paul M., 1996. "Coordinated supply chain management," European Journal of Operational Research, Elsevier, vol. 94(1), pages 1-15, October.
    17. Chen, M. S. & Chuang, C. C., 2000. "An extended newsboy problem with shortage-level constraints," International Journal of Production Economics, Elsevier, vol. 67(3), pages 269-277, October.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Janssen, Larissa & Claus, Thorsten & Sauer, Jürgen, 2016. "Literature review of deteriorating inventory models by key topics from 2012 to 2015," International Journal of Production Economics, Elsevier, vol. 182(C), pages 86-112.
    2. Sarkar, Biswajit & Majumder, Arunava, 2013. "A study on three different dimensional facility location problems," Economic Modelling, Elsevier, vol. 30(C), pages 879-887.
    3. Chiu, Yuan-Shyi Peter & Chang, Huei-Hsin, 2014. "Optimal run time for EPQ model with scrap, rework and stochastic breakdowns: A note," Economic Modelling, Elsevier, vol. 37(C), pages 143-148.
    4. Guo Li & Mengqi Liu & Xu Guan, 2017. "Diversity of payment contracts in a decentralized assembly system," Annals of Operations Research, Springer, vol. 257(1), pages 613-639, October.
    5. Tseng, Chao-Tang & Wu, Mei-Fang & Lin, Hong-Dar & Chiu, Yuan-Shyi Peter, 2014. "Solving a vendor–buyer integrated problem with rework and a specific multi-delivery policy by a two-phase algebraic approach," Economic Modelling, Elsevier, vol. 36(C), pages 30-36.
    6. Sarkar, Biswajit & Ganguly, Baishakhi & Sarkar, Mitali & Pareek, Sarla, 2016. "Effect of variable transportation and carbon emission in a three-echelon supply chain model," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 91(C), pages 112-128.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Sarmah, S.P. & Acharya, D. & Goyal, S.K., 2006. "Buyer vendor coordination models in supply chain management," European Journal of Operational Research, Elsevier, vol. 175(1), pages 1-15, November.
    2. Muhammad Waqas Iqbal & Muhammad Babar Ramzan & Asif Iqbal Malik, 2022. "Food Preservation within Multi-Echelon Supply Chain Considering Single Setup and Multi-Deliveries of Unequal Lot Size," Sustainability, MDPI, vol. 14(11), pages 1-30, June.
    3. Sana, Shib Sankar, 2013. "Optimal contract strategies for two stage supply chain," Economic Modelling, Elsevier, vol. 30(C), pages 253-260.
    4. Shib Sana, 2015. "An EOQ model for stochastic demand for limited capacity of own warehouse," Annals of Operations Research, Springer, vol. 233(1), pages 383-399, October.
    5. Sana, Shib Sankar, 2012. "A collaborating inventory model in a supply chain," Economic Modelling, Elsevier, vol. 29(5), pages 2016-2023.
    6. Bylka, Stanislaw, 2009. "Non-cooperative strategies for production and shipments lot sizing in the vendor-buyer system," International Journal of Production Economics, Elsevier, vol. 118(1), pages 243-252, March.
    7. Mohamed E. Seliaman, 2013. "Optimizing the Two-Stage Supply Chain Inventory Model with Full Information Sharing and Two Backorders Costs Using Hybrid Geometric-Algebraic Method," Journal of Optimization, Hindawi, vol. 2013, pages 1-5, May.
    8. Glock, Christoph H., 2012. "The joint economic lot size problem: A review," International Journal of Production Economics, Elsevier, vol. 135(2), pages 671-686.
    9. Ben-Daya, Mohammed & As’ad, Rami & Seliaman, Mohammed, 2013. "An integrated production inventory model with raw material replenishment considerations in a three layer supply chain," International Journal of Production Economics, Elsevier, vol. 143(1), pages 53-61.
    10. Zhang, Guoqing & Shi, Jianmai & Chaudhry, Sohail S. & Li, Xindan, 2019. "Multi-period multi-product acquisition planning with uncertain demands and supplier quantity discounts," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 132(C), pages 117-140.
    11. Halkos, George & Kevork, Ilias, 2012. "Validity and precision of estimates in the classical newsvendor model with exponential and rayleigh demand," MPRA Paper 36460, University Library of Munich, Germany.
    12. Kaya, Onur & Kubalı, Deniz & Örmeci, Lerzan, 2013. "A coordinated production and shipment model in a supply chain," International Journal of Production Economics, Elsevier, vol. 143(1), pages 120-131.
    13. Abdul-Jalbar, Beatriz & Gutierrez, Jose M. & Sicilia, Joaquin, 2007. "An integrated inventory model for the single-vendor two-buyer problem," International Journal of Production Economics, Elsevier, vol. 108(1-2), pages 246-258, July.
    14. Sarker, Bhaba R. & Rochanaluk, Ratkrit & Yi, Huizhi & Egbelu, Pius J., 2014. "An operational policy for a three-stage distributive supply chain system with retailers’ backorders," International Journal of Production Economics, Elsevier, vol. 156(C), pages 332-345.
    15. Halkos, George & Kevork, Ilias, 2012. "Evaluating alternative estimators for optimal order quantities in the newsvendor model with skewed demand," MPRA Paper 36205, University Library of Munich, Germany.
    16. Sucky, Eric, 2005. "Inventory management in supply chains: A bargaining problem," International Journal of Production Economics, Elsevier, vol. 93(1), pages 253-262, January.
    17. Banerjee, Avijit & Kim, Seung-Lae & Burton, Jonathan, 2007. "Supply chain coordination through effective multi-stage inventory linkages in a JIT environment," International Journal of Production Economics, Elsevier, vol. 108(1-2), pages 271-280, July.
    18. Pal, Brojeswar & Sana, Shib Sankar & Chaudhuri, Kripasindhu, 2012. "A multi-echelon supply chain model for reworkable items in multiple-markets with supply disruption," Economic Modelling, Elsevier, vol. 29(5), pages 1891-1898.
    19. Sajadieh, Mohsen S. & Fallahnezhad, Mohammad Saber & Khosravi, Maryam, 2013. "A joint optimal policy for a multiple-suppliers multiple-manufacturers multiple-retailers system," International Journal of Production Economics, Elsevier, vol. 146(2), pages 738-744.
    20. Zhang, Tinglong & Liang, Liang & Yu, Yugang & Yu, Yan, 2007. "An integrated vendor-managed inventory model for a two-echelon system with order cost reduction," International Journal of Production Economics, Elsevier, vol. 109(1-2), pages 241-253, September.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ecmode:v:29:y:2012:i:6:p:2274-2282. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/inca/30411 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.