Author
Listed:
- Gómez, Stefanía
- Olmos, Luis
- Ramos, Andrés
- Rivier, Michel
Abstract
A large portion of the Renewable Energy Sources generation investments occurs in remote areas, which are normally weakly connected to the rest of the system. Hence, relevant congestion occurs in the network linking these areas to the main load centres, where prices tend to be more stable. Congestion drives significant changes in the electricity price in remote areas that are difficult to predict. As a result, investors in remote areas face relevant long-term market price risk, which may prevent them from undertaking some socially beneficial generation investments. We address two main research questions. We investigate how Long-Term Financial Transmission Rights (LT-FTRs) affect the investment decisions made by risk-averse generation and transmission investors under perfect coordination. Together with this, we aim to determine what effect the use of LT-FTRs would have on the social welfare, considering the stakeholders' risk profiles and, related to this, the value that the stabilization of their revenues would have for them. In providing an answer to these questions, we, for the first time, determine the impact of the implementation of LT-FTRs on the efficiency of the system's expansion, considering the use of these rights as a tool to hedge the market price risk caused by network congestion that generation investors in remote areas are subject to. In doing so, we represent the effect of the market price risk on the generation investors' profits through the Conditional Value at Risk of these profits, considering the uncertainty factors affecting the price earned by the corresponding generators. The computation of the socially optimal expansion of the system, representing the ideal situation where the coordination of generation and transmission investments is socially efficient, is formulated, both considering LT-FTRs and not considering these, as a bi-level optimization problem. In the upper level of this problem, we represent the investment decisions that are made in the long-term, including, in the corresponding case, the contracting of FTRs to manage the price risk of generation investors, while the operation decisions are represented within the lower level of the problem. Finally, this problem is converted into an MPEC making use of the Karush-Kuhn-Tucker conditions. Finally, we explore the use of LT-FTRs in the European power system as a representative case study where the development of renewable generation in remote areas, such as the North Sea, has significant potential. Based on the results computed, we conclude that the availability of LT-FTRs to manage the price risk perceived by risk-averse generation companies in remote areas should trigger a relevant increase in the system's social welfare, and could also lead to relevant changes in the generation and, potentially, in the transmission socially optimal investment decisions, involving additional generation investments in remote areas, particularly in the North Sea within the European system.
Suggested Citation
Gómez, Stefanía & Olmos, Luis & Ramos, Andrés & Rivier, Michel, 2025.
"A bi-level framework to analyse the alternative use of FTRs as a long-term risk hedging instrument. Application to a European case study,"
Applied Energy, Elsevier, vol. 380(C).
Handle:
RePEc:eee:appene:v:380:y:2025:i:c:s0306261924024784
DOI: 10.1016/j.apenergy.2024.125094
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:appene:v:380:y:2025:i:c:s0306261924024784. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/wps/find/journaldescription.cws_home/405891/description#description .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.