Monitoring Process Mean and Process Variance Using Collani's Statistic
Author
Abstract
Suggested Citation
DOI: 10.1515/EQC.2005.223
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Shaul P. Ladany, 1973. "Optimal Use of Control Charts for Controlling Current Production," Management Science, INFORMS, vol. 19(7), pages 763-772, March.
- Ladany, Shaul P & Alperovitch, Yoram, 1975. "An optimal set-up policy for control charts," Omega, Elsevier, vol. 3(1), pages 113-118, February.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Tagaras, George, 1996. "Dynamic control charts for finite production runs," European Journal of Operational Research, Elsevier, vol. 91(1), pages 38-55, May.
- Francisco Delgadillo & Ronald Bremer, 2010. "The development of a destructive sampling method designed for high quality production processes (DSM-HQ)," Quality & Quantity: International Journal of Methodology, Springer, vol. 44(3), pages 595-605, April.
- Lee Ho, Linda & de Medeiros, Pledson Guedes & Borges, Wagner, 2007. "An alternative model for on-line quality monitoring for variables," International Journal of Production Economics, Elsevier, vol. 107(1), pages 202-222, May.
- Mahfuza Khatun & Michael B.C. Khoo & Sajal Saha & Philippe Castagliola, 2021. "A new distribution‐free adaptive sample size control chart for a finite production horizon and its application in monitoring fill volume of soft drink beverage bottles," Applied Stochastic Models in Business and Industry, John Wiley & Sons, vol. 37(1), pages 84-97, January.
- Amir Ahmadi-Javid & Mohsen Ebadi, 2017. "Economic Design of Memory-Type Control Charts: The Fallacy of the Formula Proposed by Lorenzen and Vance (1986)," Papers 1708.06160, arXiv.org.
- Elart Collani, 1989. "Economically optimalc- andnp-control charts," Metrika: International Journal for Theoretical and Applied Statistics, Springer, vol. 36(1), pages 215-232, December.
- Amir Ahmadi-Javid & Mohsen Ebadi, 2021. "Economic design of memory-type control charts: The fallacy of the formula proposed by Lorenzen and Vance (1986)," Computational Statistics, Springer, vol. 36(1), pages 661-690, March.
- Asma Amdouni & Philippe Castagliola & Hassen Taleb & Giovanni Celano, 2017. "A variable sampling interval Shewhart control chart for monitoring the coefficient of variation in short production runs," International Journal of Production Research, Taylor & Francis Journals, vol. 55(19), pages 5521-5536, October.
More about this item
Keywords
Economic design; T2 charts; charts; charts;All these keywords.
JEL classification:
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:bpj:ecqcon:v:20:y:2005:i:2:p:223-229:n:6. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Peter Golla (email available below). General contact details of provider: https://www.degruyter.com .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.