Financial Analysis Of Design 4 MW Mini-Hydro Power Plant In Cipelah, Bandung Regency

Author

Listed:
  • Dedy Setyo Oetomo

    (Wastukancana Technological College of Purwakarta, Indonesia)

  • Rizky Fajar Ramdhani2

    (STT Wastukancana Purwakarta,Indonesia Jl. Alternative Bukit Indah – Purwakarta, Mulyamekar, Kec. Babakancikao, Kabupaten Purwakarta, Jawa Barat 41151)

Abstract

Mini Hydro Power Plants (PLTM) have low operating costs compared to Diesel Power Plants (PLTD). Mini hydro uses renewable energy from water resources. Planning the PLTMH in Cipelah District includes Weir, Intake, Soothing Tub (Forebay), Rapid Pipe ( Penstock), and selection of turbines. The power generated from the effective fall height is 71.3 m, and a discharge of 2 x 3.51 m3 / s is 4 MW. With a maximum capacity per year of 35.04 MWH. Total Production to PLN per year 23.93 MWH. The calculation of the feasibility analysis for the construction of a Mini Hydro Power Plant obtained an investment value of 6,297,758 USD. The interest rate used is 6%, the composition of the loan is 4,408,431 USD, and the equity is 1,889,328 USD. The IRR value of the PLTM CIpelah development plan is 20.58%, and the NPV value is USD 11,952,550 and the Payback Period is five years. The conclusion is that the Cipelah PLTM construction project is feasible to build.

Suggested Citation

  • Dedy Setyo Oetomo & Rizky Fajar Ramdhani2, 2021. "Financial Analysis Of Design 4 MW Mini-Hydro Power Plant In Cipelah, Bandung Regency," International Journal of Research and Scientific Innovation, International Journal of Research and Scientific Innovation (IJRSI), vol. 8(6), pages 82-88, June.
  • Handle: RePEc:bjc:journl:v:8:y:2022:i:6:p:82-88
    as

    Download full text from publisher

    File URL: https://www.rsisinternational.org/journals/ijrsi/digital-library/volume-8-issue-6/82-88.pdf
    Download Restriction: no

    File URL: https://www.rsisinternational.org/virtual-library/papers/financial-analysis-of-design-4-mw-mini-hydro-power-plant-in-cipelah-bandung-regency/
    Download Restriction: no
    ---><---

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:bjc:journl:v:8:y:2022:i:6:p:82-88. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Dr. Renu Malsaria (email available below). General contact details of provider: https://rsisinternational.org/journals/ijrsi/ .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.