IDEAS home Printed from https://ideas.repec.org/a/bjc/journl/v7y2020i7p223-228.html
   My bibliography  Save this article

Repair the Layout of Finish Goods Due to Fire Precautions in Warehouse of Manufacture Industry

Author

Listed:
  • Sa’dillah

    (Magister Program Student, Universitas Mercu Buana, Jakarta, Indonesia)

  • Setyo Riyanto

    (Associate Professor, Universitas Mercu Buana, Jakarta, Indonesia)

Abstract

The objective to be achieved in writing this article is to design the layout of finished goods in an efficient warehouse which refers to the guidelines for fire prevention, so that the fulfillment of finished goods based on demand remains fulfilled and the accumulation of goods is carried out by the FIFO method. Arrange the layout of the new warehouse in the warehouse using the pyramid stacking method and special clusters because the available storage locations are determined based on groups of goods making it easier for warehouse operators to identify and store. The difference between the initial layout and the proposed layout is based on the data contained in the Guidelines. The finished goods before the application of fire prevention measures are 2729 pallets position, and after the application of 2394 pallets position, there are 335 pallets depreciations, where fire precaution of storage area is have been successfully implemented.

Suggested Citation

  • Sa’dillah & Setyo Riyanto, 2020. "Repair the Layout of Finish Goods Due to Fire Precautions in Warehouse of Manufacture Industry," International Journal of Research and Scientific Innovation, International Journal of Research and Scientific Innovation (IJRSI), vol. 7(7), pages 223-228, July.
  • Handle: RePEc:bjc:journl:v:7:y:2020:i:7:p:223-228
    as

    Download full text from publisher

    File URL: https://www.rsisinternational.org/journals/ijrsi/digital-library/volume-7-issue-7/223-228.pdf
    Download Restriction: no

    File URL: https://www.rsisinternational.org/virtual-library/papers/repair-the-layout-of-finish-goods-due-to-fire-precautions-in-warehouse-of-manufacture-industry/
    Download Restriction: no
    ---><---

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:bjc:journl:v:7:y:2020:i:7:p:223-228. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Dr. Renu Malsaria (email available below). General contact details of provider: https://rsisinternational.org/journals/ijrsi/ .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.