Author
Abstract
Purpose - Understanding construction cash flow estimation is crucial for project success. Experts are concerned about project's cash-flow and risk estimation and control. Latest construction studies concentrated on modelling and estimating construction costs and risks. Methodology - This article aims to approach pure quantitative mathematical modelling to develop the S-Curves (i.e., cash-flow and risks) and to develop the cash-flow simple area method. This research referred to the mathematical definitions of construction cash-flow and risks, integrating a clear systematic approach to develop the s-curves and to build the simple-area-method. Findings - This research paper reviled that construction cash-flow and risk s-curves can be developed at the preconstruction stage, mathematically, without the need for having cost historical data of similar completed projects. In addition, this article has provided a simple area method approach mathematically, for construction cash flow analysis, using the basic developed cash-flow s-curve and the actual cost data of, at least, 2 completed similar projects. The simple area method is proved effective to provide a better understanding of cash-flow behaviour of the analysed projects' type. However, the s-curves development can be generalised to cover construction cost and risk simple s-curves, while the area method is restricted with the projects' characteristics (i.e., type, size, location, etc.) used in developing the simple area. Unique contribution to theory, practice and policy - The significance of this study is to provide an S-Curve development approach for both cashflow and risk percentages from client perspective at the preconstruction stage, using solely the tender contract value. And to provide a simpler stochastic area method approach for project management professionals/researchers, who do not have large amount of historical similar projects' cost data. Originality, theoretical-implications, practical-implications, and limitations are presented in the conclusion for future research.
Suggested Citation
Download full text from publisher
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:bhx:ojjepm:v:6:y:2021:i:2:p:1-37:id:658. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chief Editor (email available below). General contact details of provider: https://carijournals.org/journals/index.php/JEPM/ .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.