IDEAS home Printed from https://ideas.repec.org/a/bfy/ojijpm/v6y2024i4p45-56id2478.html
   My bibliography  Save this article

Impact of Project Scheduling Tools on Resource Optimization in Manufacturing Projects in Rwanda

Author

Listed:
  • Samuel Sehene

Abstract

Purpose: The aim of the study was to assess the impact of project scheduling tools on resource optimization in manufacturing projects in the Rwanda. Methodology: This study adopted a desk methodology. A desk study research design is commonly known as secondary data collection. This is basically collecting data from existing resources preferably because of its low cost advantage as compared to a field research. Our current study looked into already published studies and reports as the data was easily accessed through online journals and libraries. Findings: The study found that the use of project scheduling tools significantly enhances resource optimization in manufacturing projects by improving efficiency and reducing waste. These tools enable project managers to allocate resources more effectively, allowing for better tracking of tasks and timelines, which minimizes idle time and maximizes productivity. Research indicates that project scheduling software facilitates real-time data sharing and communication among team members, leading to informed decision-making and timely adjustments to project plans. By analyzing workload distribution, these tools also help identify bottlenecks and underutilized resources, allowing managers to redistribute tasks and optimize labor utilization. Ultimately, the integration of project scheduling tools in manufacturing not only streamlines operations but also contributes to cost savings and improved overall project outcomes. Implications to Theory, Practice and Policy: Resource-based view (RBV) theory, theory of constraints (TOC) and agile project management theory may be used to anchor future studies on assessing the impact of project scheduling tools on resource optimization in manufacturing projects in Rwanda. Manufacturing firms should invest in customized training programs for project managers and teams to maximize the effectiveness of project scheduling tools. Policymakers should consider creating frameworks that encourage the adoption of advanced project scheduling tools in the manufacturing sector.

Suggested Citation

  • Samuel Sehene, 2024. "Impact of Project Scheduling Tools on Resource Optimization in Manufacturing Projects in Rwanda," International Journal of Project Management, AJPO Journals Limited, vol. 6(4), pages 45-56.
  • Handle: RePEc:bfy:ojijpm:v:6:y:2024:i:4:p:45-56:id:2478
    as

    Download full text from publisher

    File URL: https://ajpojournals.org/journals/index.php/IJPM/article/view/2478/3297
    Download Restriction: no
    ---><---

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:bfy:ojijpm:v:6:y:2024:i:4:p:45-56:id:2478. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chief Editor (email available below). General contact details of provider: https://ajpojournals.org/journals/index.php/IJPM/ .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.