IDEAS home Printed from https://ideas.repec.org/a/bdu/oijepm/v9y2024i4p55-65id3090.html
   My bibliography  Save this article

Project Management Strategies and Optimization of Construction Supply Chain in Rwanda’s Construction Projects

Author

Listed:
  • Enock Tuyishime
  • Dr. Naomi Njoroge

Abstract

Purpose: This study explored management strategies and their influence on optimizing the construction supply chain in Rwanda, focusing on the Amahoro Stadium project. The specific objectives included assessing the impact of logistics management, technology integration. Methodology: A mixed-methods approach with a descriptive survey design was used, targeting 128 individuals and entities involved in the construction supply chain of Amahoro Stadium. The sample size of 97 respondents was determined using the Granular formula. Data were collected through questionnaires and interviews, combining both quantitative and qualitative insights. Findings: The study revealed that logistics management, technology integration, and customer management all have significant positive relationships with the optimization of the construction supply chain in Rwanda. Key findings included a strong agreement among respondents that effective transportation (43.2%), inventory control (48.4%), and customer feedback (83.6%) influence supply chain optimization. The correlation analysis showed that 87.6% of the variation in construction supply chain optimization can be explained by these three independent variables. The study concluded that a comprehensive strategy involving logistics management, technology integration, and customer engagement is essential for optimizing construction supply chains in Rwanda. Unique Contribution to Theory, Practice and Policy: Recommendations include investing in logistics training, adopting advanced technologies, and fostering customer relationships to improve satisfaction and project outcomes. Further research into the long-term impacts of these strategies on supply chain optimization and sustainability was also suggested.

Suggested Citation

  • Enock Tuyishime & Dr. Naomi Njoroge, 2024. "Project Management Strategies and Optimization of Construction Supply Chain in Rwanda’s Construction Projects," International Journal of Entrepreneurship and Project Management, IPRJB, vol. 9(4), pages 55-65.
  • Handle: RePEc:bdu:oijepm:v:9:y:2024:i:4:p:55-65:id:3090
    as

    Download full text from publisher

    File URL: https://www.iprjb.org/journals/index.php/IJEPM/article/view/3090/3668
    Download Restriction: no
    ---><---

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:bdu:oijepm:v:9:y:2024:i:4:p:55-65:id:3090. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chief Editor (email available below). General contact details of provider: https://iprjb.org/journals/index.php/IJEPM/ .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.