Author
Listed:
- Erastus M Mwanaumo
(University of Zambia)
- Chipo C Mwale
(University of Zambia)
- Ethel T Mwanaumo
(University of Zambia)
- Bupe GM Mwanza
(University of Zambia)
- Sampa Chisumbe
(University of Zambia)
Abstract
The study aimed to examine the effects of compliance and monitoring of performance of public sector construction projects, assess the effect of contract documentation and determine the technical capabilities and constraints faced by contractors on the performance of public sector construction projects. A quantitative correlational research design was adopted, and a research questionnaire was used for data collection. The study findings revealed compliance with the contractual terms by contractors, enhanced procurement contract management with a mean of 4.10 and standard deviation of 1.145. Further, 80.2% of the respondents agreed that failure to understand the contract document leads to mistakes in contract implementation, which causes unnecessary rework and increases project costs. Monitoring procurement contracts is important in project management because it helps the contractors to remain focused. These findings are supported by standard deviation between 1.072 and 1.197 which implies consensus among the respondents. The study concluded that compliance with contract terms and conditions as well as monitoring procurement contracts were metrics that on their own, could lead to a positive influence on contract management. These metrics must work conjunctively with other metrics for them to lead to a positive influence on project performance. Contract documentation and technical capabilities were seen to be impactful on project performance as they could lead to a positive change in contract management. The study recommends that the government emphasizes contract documentation and contract monitoring of projects and Contract Manager involvement at the initial stages of the project. The study is limited to public sector, therefore recommends that a similar study be conducted in private sector to establish outcomes in comparison to public sector experience.
Suggested Citation
Erastus M Mwanaumo & Chipo C Mwale & Ethel T Mwanaumo & Bupe GM Mwanza & Sampa Chisumbe, 2024.
"Practitioner Insights on Determinants of Procurement Contract Management and Constraints in Government Construction,"
International Journal of Research and Innovation in Social Science, International Journal of Research and Innovation in Social Science (IJRISS), vol. 8(14), pages 310-333, November.
Handle:
RePEc:bcp:journl:v:8:y:2024:i:14:p:310-333
Download full text from publisher
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:bcp:journl:v:8:y:2024:i:14:p:310-333. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Dr. Pawan Verma (email available below). General contact details of provider: https://rsisinternational.org/journals/ijriss/ .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.