IDEAS home Printed from https://ideas.repec.org/a/bcp/journl/v7y2023i5p95-107.html
   My bibliography  Save this article

Cost-Related Risks and Completion of Commercial Building Construction Projects in Kisumu County, Kenya

Author

Listed:
  • Amugongo Nelson Ephraem

    (MA Project Planning and Management, University of Nairobi, Kenya)

  • Dr Mwenda Mary Nyawira

    (Lecturer, Faculty of Business and Management Sciences, University of Nairobi, Kenya)

Abstract

For any country to succeed in the 21st century, infrastructure development is critical. Its objective is to create a significant number of employment and accelerate economic growth. Therefore, there is a need for heavy financial investment in projects involved in infrastructure development. However, one needs to consider the waste of resources a country could incur if the project is not managed properly. These losses result from a variety of risks connected to these sorts of development initiatives. These risks have a significant influence. For a project to be completed successfully, it has to be within the schedule and allocated budget. The objective of the study was to determine the influence of cost-related risks on completion of commercial building construction projects in Kisumu County. This research was guided by theory of constraints. The research used a descriptive survey research design. The research was conducted in Kisumu County and the target population constituted of structural engineers, civil engineers, construction project managers, mechanical engineers and electrical engineers making a total of 400 respondents. Yamane formula was applied in determining the sample size which was 234 respondents. Stratified sampling method was applied in selecting a sample size. Questionnaires were used to obtain primary data while contract documents, journals and progress reports from the identified projects were utilized to collect secondary data. With the assistance of a computer software, Statistical package for Social Sciences, descriptive statistics was applied in analyzing quantitative data for statistics. Inferential statistics was done through Pearson Correlation Coefficient and Regression Analysis was utilized. It was established that cost related risks with r=0.430, r2=0.185, β=0.004, t=7.151 and the F (1, 173) = 47.79 at p=0.000

Suggested Citation

  • Amugongo Nelson Ephraem & Dr Mwenda Mary Nyawira, 2023. "Cost-Related Risks and Completion of Commercial Building Construction Projects in Kisumu County, Kenya," International Journal of Research and Innovation in Social Science, International Journal of Research and Innovation in Social Science (IJRISS), vol. 7(5), pages 95-107, May.
  • Handle: RePEc:bcp:journl:v:7:y:2023:i:5:p:95-107
    as

    Download full text from publisher

    File URL: https://www.rsisinternational.org/journals/ijriss/Digital-Library/volume-7-issue-5/95-107.pdf
    Download Restriction: no

    File URL: https://www.rsisinternational.org/journals/ijriss/articles/cost-related-risks-and-completion-of-commercial-building-construction-projects-in-kisumu-county-kenya/
    Download Restriction: no
    ---><---

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:bcp:journl:v:7:y:2023:i:5:p:95-107. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Dr. Pawan Verma (email available below). General contact details of provider: https://rsisinternational.org/journals/ijriss/ .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.