IDEAS home Printed from https://ideas.repec.org/a/baq/jetart/v5y2022i13p32-42.html
   My bibliography  Save this article

Creating incentives for managing construction waste generated during the war

Author

Listed:
  • Valentyna Marchenko

    (National Technical University of Ukraine “Igor Sikorsky Kyiv Polytechnic Institute”)

  • Valerii Osetskyi

    (Taras Shevchenko National University of Kyiv)

  • Alla Hrechko

    (National Technical University of Ukraine “Igor Sikorsky Kyiv Polytechnic Institute”)

  • Bogdan Dergaliuk

    (National Technical University of Ukraine “Igor Sikorsky Kyiv Polytechnic Institute”)

  • Oksana Kavtysh

    (National Technical University of Ukraine “Igor Sikorsky Kyiv Polytechnic Institute”)

  • Vitaliy Shutyuk

    (National University of Food Technologies)

Abstract

The object of this study is a system of incentives aimed at activating the processes to manage construction waste formed during hostilities. The problem being solved is to form incentives for the growth of economic interest in construction waste management. The structural and functional readiness of the economy for the management of waste generated as a result of hostilities is investigated. It was revealed that 60 % of the participants in the waste management system are microenterprises with a profitability of 0.2 %. The level of construction waste disposal and the level of its reuse are estimated. Forecasts of the behavior of methods of waste management in the absence of changes in state policy have been made. Based on the use of forecasting methods, a trend of increasing the amount of waste dumped at landfills has been identified. The directions of state influence on the formation of economic incentives for the processing of construction waste have been proposed. A special feature of the study's results is that the inconsistency of existing incentives with the needs of participants in the field of waste management has been investigated. The problem with the activities of small enterprises is the demand for performance, at the formation of which government efforts should be directed. Distinctive features of the results are that they solve the problems of achieving a balance of economic interests of participants in the management of construction waste generated during the war. The area of practical use of the obtained results is the system of state and local management of waste handling activities

Suggested Citation

  • Valentyna Marchenko & Valerii Osetskyi & Alla Hrechko & Bogdan Dergaliuk & Oksana Kavtysh & Vitaliy Shutyuk, 2022. "Creating incentives for managing construction waste generated during the war," Eastern-European Journal of Enterprise Technologies, PC TECHNOLOGY CENTER, vol. 5(13(119)), pages 32-42, October.
  • Handle: RePEc:baq:jetart:v:5:y:2022:i:13:p:32-42
    DOI: 10.15587/1729-4061.2022.265646
    as

    Download full text from publisher

    File URL: https://journals.uran.ua/eejet/article/view/265646/262264
    Download Restriction: no

    File URL: https://libkey.io/10.15587/1729-4061.2022.265646?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:baq:jetart:v:5:y:2022:i:13:p:32-42. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Iryna Prudius (email available below). General contact details of provider: https://journals.uran.ua/eejet/issue/archive .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.