Abstract

PT. X Company is a fishing boat manufacturing company that manufactures boats, speed boats, and sampan types using an order production process. The stages in making a ship include wood selection, determining the size of the vessel and cutting, wood smoothing, ship assembly, unification with glue between wood, and finishing, including smoothing the ship's body and painting. The vessels produced are, on average, 5 - 7.5 meters in size and weigh 500 kg - 2.5 tons with a completion time of 1 month and three months worked on by six workers still using traditional methods. Many workers currently complain of fatigue caused by the length of the shipbuilding process, and the temperature of the production work environment reaches 34o due to the weather. The study was conducted based on problem factors, including physical work environment factors, equipment/machine factors, workload factors, and organizational factors, with the aim of the study to provide suggestions for improving the work system by using the Macroergonomic Analysis and Design approach to increase worker productivity. Workers feel healthier and more comfortable in doing their jobs. The results obtained from the SPSS 23 calculation show that the work environment, equipment and machines, workload, and significant organization have a simultaneous effect because F count (0.00) < F table (0.05 on the work system. The measure of the worker's pulse to reduce fatigue obtained CVL = 37.32%, average rest energy consumption = 2.97 kcal/minute, and an additional 16 minutes of rest time was received at 12.00-13.19, so the total was 79 minutes. Work productivity in measuring and cutting wood produced 16 pieces of ship components per day, so there was an increase in work productivity of 2 pieces of ship components per day.

Suggested Citation

  • A. Amri & Muhammad Zakaria & Yovi Chandra, 2024. "Work system improvement model with macro ergonomic analysis and design method approach," Edelweiss Applied Science and Technology, Learning Gate, vol. 8(6), pages 7490-7507.
  • Handle: RePEc:ajp:edwast:v:8:y:2024:i:6:p:7490-7507:id:3627
    as

    Download full text from publisher

    File URL: https://learning-gate.com/index.php/2576-8484/article/view/3627/1358
    Download Restriction: no
    ---><---

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:ajp:edwast:v:8:y:2024:i:6:p:7490-7507:id:3627. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Melissa Fernandes (email available below). General contact details of provider: https://learning-gate.com/index.php/2576-8484/ .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.