IDEAS home Printed from https://ideas.repec.org/a/ajp/edwast/v8y2024i6p2332-2345id2477.html
   My bibliography  Save this article

Time reduction in changing of plastic injection mold part bottom cover injection machine size 380 ton

Author

Listed:
  • Anyarat SONSANAM
  • Somporn VONGPEANG
  • Tanut SRIPANOM
  • Parvinee ANGBOONT
  • Tawatchai SONSANAM

Abstract

This study focuses on enhancing efficiency by reducing the time required to adjust plastic injection molds on a 380-ton machine. The setup time for mold change was 61 minutes, exceeding the company's target of 30 minutes. The research employed a quasi-experimental approach, capturing pre-improvement data, measuring the time for each mold change, and documenting sub-work steps using a Flow Process Chart and a Man-Machine Chart. The main activities identified were mold change and Jig robot adjustment using the Quick changeover technique, involving internal and external activities. The study revealed that some mold-changing steps could be prepared in advance, and applying SMED (Single Minute Exchange of Die) and ECRS (Eliminate, Combine, Rearrange, Simplify) principles led to the identification of seven external adjustment steps. Assigning another employee to assist in these steps significantly reduced the average mold adjustment time to 28 minutes, representing a 54.09% improvement.

Suggested Citation

  • Anyarat SONSANAM & Somporn VONGPEANG & Tanut SRIPANOM & Parvinee ANGBOONT & Tawatchai SONSANAM, 2024. "Time reduction in changing of plastic injection mold part bottom cover injection machine size 380 ton," Edelweiss Applied Science and Technology, Learning Gate, vol. 8(6), pages 2332-2345.
  • Handle: RePEc:ajp:edwast:v:8:y:2024:i:6:p:2332-2345:id:2477
    as

    Download full text from publisher

    File URL: https://learning-gate.com/index.php/2576-8484/article/view/2477/948
    Download Restriction: no
    ---><---

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:ajp:edwast:v:8:y:2024:i:6:p:2332-2345:id:2477. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Melissa Fernandes (email available below). General contact details of provider: https://learning-gate.com/index.php/2576-8484/ .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.