R. J. Briggs
Personal Details
First Name: | R. J. |
Middle Name: | |
Last Name: | Briggs |
Suffix: | |
RePEc Short-ID: | pbr446 |
| |
http://eme.psu.edu/faculty/briggs.html | |
Terminal Degree: | 2009 Department of Economics; University of Texas-Austin (from RePEc Genealogy) |
Affiliation
Pennsylvania State University, Department of Energy and Mineral Engineering
http://eme.psu.eduUSA, University Park
Research output
Jump to: ArticlesArticles
- Briggs, R.J. & Kleit, Andrew, 2013. "Resource adequacy reliability and the impacts of capacity subsidies in competitive electricity markets," Energy Economics, Elsevier, vol. 40(C), pages 297-305.
- Briggs, R.J., 2011. "Prices vs. quantities in a dynamic problem: Externalities from resource extraction," Resource and Energy Economics, Elsevier, vol. 33(4), pages 843-854.
Citations
Many of the citations below have been collected in an experimental project, CitEc, where a more detailed citation analysis can be found. These are citations from works listed in RePEc that could be analyzed mechanically. So far, only a minority of all works could be analyzed. See under "Corrections" how you can help improve the citation analysis.Articles
- Briggs, R.J. & Kleit, Andrew, 2013.
"Resource adequacy reliability and the impacts of capacity subsidies in competitive electricity markets,"
Energy Economics, Elsevier, vol. 40(C), pages 297-305.
Cited by:
- Clements, A.E. & Hurn, A.S. & Li, Z., 2016. "Strategic bidding and rebidding in electricity markets," Energy Economics, Elsevier, vol. 59(C), pages 24-36.
- Coester, Andreas & Hofkes, Marjan W. & Papyrakis, Elissaios, 2018. "An optimal mix of conventional power systems in the presence of renewable energy: A new design for the German electricity market," Energy Policy, Elsevier, vol. 116(C), pages 312-322.
- Gerard Llobet & Jorge Padilla, 2018.
"Conventional Power Plants in Liberalized Electricity Markets with Renewable Entry,"
Working Papers
wp2018_1801, CEMFI.
- Gerard Llobet and Jorge Padilla, 2018. "Conventional Power Plants in Liberalized Electricity Markets with Renewable Entry," The Energy Journal, International Association for Energy Economics, vol. 0(Number 3).
- Llobet, Gerard & Padilla, Jorge, 2018. "Conventional Power Plants in Liberalized Electricity Markets with Renewable Entry," CEPR Discussion Papers 12556, C.E.P.R. Discussion Papers.
- Sylwia Bialek & Burcin Unel, 2020.
"Efficiency in Wholesale Electricity Markets: On the Role of Externalities and Subsidies,"
CESifo Working Paper Series
8673, CESifo.
- Bialek, Sylwia & Ünel, Burçin, 2022. "Efficiency in wholesale electricity markets: On the role of externalities and subsidies," Energy Economics, Elsevier, vol. 109(C).
- Brown, David, 2014.
"The Effect of Subsidized Entry on Capacity Auctions and the Long-Run Resource Adequacy of Electricity Markets,"
Working Papers
2014-7, University of Alberta, Department of Economics.
- Brown, David P., 2018. "The effect of subsidized entry on capacity auctions and the long-run resource adequacy of electricity markets," Energy Economics, Elsevier, vol. 70(C), pages 205-232.
- Aleksandra Komorowska, 2021. "Can Decarbonisation and Capacity Market Go Together? The Case Study of Poland," Energies, MDPI, vol. 14(16), pages 1-35, August.
- Zhang, Huiming & Zheng, Yu & Ozturk, U. Aytun & Li, Shanjun, 2016. "The impact of subsidies on overcapacity: A comparison of wind and solar energy companies in China," Energy, Elsevier, vol. 94(C), pages 821-827.
- Heidarizadeh, Mohammad & Ahmadian, Mohammad, 2019. "Capacity certificate mechanism: A step forward toward a market based generation capacity incentive," Energy, Elsevier, vol. 172(C), pages 45-56.
- S. Oliveira, Fernando & William-Rioux, Bertrand & Pierru, Axel, 2023. "Capacity expansion in liberalized electricity markets with locational pricing and renewable energy investments," Energy Economics, Elsevier, vol. 127(PB).
- Lin, Boqiang & He, Jiaxin, 2017. "Is biomass power a good choice for governments in China?," Renewable and Sustainable Energy Reviews, Elsevier, vol. 73(C), pages 1218-1230.
- Cl'emence Alasseur & Heythem Farhat & Marcelo Saguan, 2019. "A Principal-Agent approach to Capacity Remuneration Mechanisms," Papers 1911.12623, arXiv.org, revised Sep 2020.
- Lemus, Ana B. & Moreno, Diego, 2017. "Price caps with capacity precommitment," International Journal of Industrial Organization, Elsevier, vol. 50(C), pages 131-158.
- Bublitz, Andreas & Keles, Dogan & Zimmermann, Florian & Fraunholz, Christoph & Fichtner, Wolf, 2018. "A survey on electricity market design: Insights from theory and real-world implementations of capacity remuneration mechanisms," Working Paper Series in Production and Energy 27, Karlsruhe Institute of Technology (KIT), Institute for Industrial Production (IIP).
- Khezr, Peyman & Nepal, Rabindra, 2021. "On the viability of energy-capacity markets under decreasing marginal costs," Energy Economics, Elsevier, vol. 96(C).
- Bublitz, Andreas & Keles, Dogan & Zimmermann, Florian & Fraunholz, Christoph & Fichtner, Wolf, 2019. "A survey on electricity market design: Insights from theory and real-world implementations of capacity remuneration mechanisms," Energy Economics, Elsevier, vol. 80(C), pages 1059-1078.
More information
Research fields, statistics, top rankings, if available.Statistics
Access and download statistics for all items
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. For general information on how to correct material on RePEc, see these instructions.
To update listings or check citations waiting for approval, R. J. Briggs should log into the RePEc Author Service.
To make corrections to the bibliographic information of a particular item, find the technical contact on the abstract page of that item. There, details are also given on how to add or correct references and citations.
To link different versions of the same work, where versions have a different title, use this form. Note that if the versions have a very similar title and are in the author's profile, the links will usually be created automatically.
Please note that most corrections can take a couple of weeks to filter through the various RePEc services.