This paper examines the economic and regulatory challenges that must be faced by potential investors in new nuclear power plants in the United States. The historical development of the existing fleet of over 100 nuclear plants and their recent performance history are discussed. The pattern of re-licensing of existing plants and the implications for the role of the extended operation of the existing fleet in the overall electricity supply portfolio over the next 50 years is examined. The economic competitiveness of investments in new nuclear power plants compared to investments in alternative base load technologies is discussed under a variety of assumptions about construction costs, fuel costs, competitive and economic regulatory environments and various levels of carbon emissions prices affected competing fossil-fueled technologies. Federal government efforts to facilitate investment in new nuclear power plants, including streamlined licensing procedures and financial incentive provided by the Energy Policy Act of 2005 are discussed. These regulatory changes and financial incentives improve the economic competitiveness of nuclear power. First mover plants that can benefit from federal financial incentives are most likely to be built in states that continue to regulate generating plants based on cost-of-service principles, transferring construction cost and operating performance risks to consumers, and where there is room on existing sites to build additional nuclear capacity. Once federal financial incentives come to an end lower and more stable construction costs combined with carbon emissions charges are likely to be necessary to make investments in new nuclear plants significantly more attractive than investments in pulverized coal plants. Unresolved waste disposal policies and local opposition to new nuclear plants are likely to represent barriers to investment in new nuclear power plants in some areas of the country.

Download Info
To download:

If you experience problems downloading a file, check if you have the proper application to view it first. Information about this may be contained in the File-Format links below. In case of further problems read the IDEAS help page. Note that these files are not on the IDEAS site. Please be patient as the files may be large.

File URL: http://tisiphone.mit.edu/RePEc/mee/wpaper/2006-019.pdf
File Format: application/pdf
File Function:
Download Restriction: no

Publisher Info
Paper provided by Massachusetts Institute of Technology, Center for Energy and Environmental Policy Research in its series Working Papers with number 0619.

Download reference. The following formats are available: HTML (with abstract), plain text (with abstract), BibTeX, RIS (EndNote, RefMan, ProCite), ReDIF
Length:
Date of creation: Dec 2006
Date of revision:
Handle: RePEc:mee:wpaper:0619

Contact details of provider:
Postal: 77 Massachusetts Ave. (Building E40-279), Cambridge, MA 02139-4307
Phone: (617) 253-3551
Fax: (617) 253-9845
Email:
Web page: http://tisiphone.mit.edu/RePEc
More information through EDIRC

For technical questions regarding this item, or to correct its listing, contact: (Sharmila Ganguly).

Related research
Keywords:

Other versions of this item:

This paper has been announced in the following NEP Reports: References listed on IDEAS
Please report citation or reference errors to , or , if you are the registered author of the cited work, log in to your RePEc Author Service profile, click on "citations" and make appropriate adjustments.:
  1. Paul L. Joskow, 2005. "Markets For Power In The United States - An Interim Assessment," Working Papers 0512, Massachusetts Institute of Technology, Center for Energy and Environmental Policy Research. [Downloadable!]
    Other versions:
  2. Paul L. Joskow, 2006. "Competitive Electricity Markets And Investment In New Generating Capacity," Working Papers 0609, Massachusetts Institute of Technology, Center for Energy and Environmental Policy Research. [Downloadable!]
  3. Paul L. Joskow, 2006. "Incentive Regulation for Electricity Networks," CESifo DICE Report, Ifo Institute for Economic Research at the University of Munich, vol. 4(2), pages 3-9, 07. [Downloadable!]
Full references

Cited by:
(explanations, Please report citation or reference errors to , or , if you are the registered author of the cited work, log in to your RePEc Author Service profile, click on "citations" and make appropriate adjustments.)

  1. Finon, D. & Roques, F., 2008. "Financing arrangements and industrial organisation for new nuclear build in electricity markets," Cambridge Working Papers in Economics 0850, Faculty of Economics, University of Cambridge. [Downloadable!]
Statistics
Access and download statistics

Did you know? You can include your works in the database easily by uploading them on the Munich Personal RePEc Archive (MPRA) if you do not have access to an institutional RePEc archive.

This page was last updated on 2009-10-30.


This information is provided to you by IDEAS at the Department of Economics, College of Liberal Arts and Sciences, University of Connecticut using RePEc data on a server sponsored by the Society for Economic Dynamics.