IDEAS home Printed from https://ideas.repec.org/a/spr/annopr/v291y2020i1d10.1007_s10479-018-3041-6.html
   My bibliography  Save this article

Impact of power structures in a subcontracting assembly system

Author

Listed:
  • Guo Li

    (Beijing Institute of Technology
    Beijing Institute of Technology
    Sustainable Development Research Institute for Economy and Society of Beijing)

  • Lin Li

    (Beijing Institute of Technology
    Beijing Institute of Technology
    Sustainable Development Research Institute for Economy and Society of Beijing)

  • Mengqi Liu

    (Hunan University)

  • Suresh P. Sethi

    (The University of Texas at Dallas)

Abstract

We investigate the impact of power structures on the production and pricing strategies in a decentralized subcontracting assembly system consisting of two suppliers (key supplier and subcontractor) and one manufacturer (assembler). The key supplier, who is also the general contractor, negotiates with the manufacturer and assigns partial component production to the subcontractor. We first identify a single power regime (SPR), in which either the key supplier or the manufacturer determines the wholesale price or the order/production quantity. Under SPR, we consider three power structures, namely, KSA, KAS, and SKA. We find that the assembly system will substantially benefit under KAS. Results show that the subcontracting mechanism between the two suppliers can increase each firm’s profit and disperse the bargaining power. Such a decentralization of powers can weaken the horizontal decentralization between the suppliers and improve the system’s performance, thereby achieving a win–win situation. Furthermore, we extend our analysis to a dual power regime (DPR), in which the key supplier or the manufacturer decides on price and quantity. We show that the proposed assembly system performs optimally under DPR. Moreover, the system will benefit if the firm that is substantially near the end market makes the centralization decision. Compared with the classical pull and push contract model, the proposed assembly system provides the best performance under DPR.

Suggested Citation

  • Guo Li & Lin Li & Mengqi Liu & Suresh P. Sethi, 2020. "Impact of power structures in a subcontracting assembly system," Annals of Operations Research, Springer, vol. 291(1), pages 475-498, August.
  • Handle: RePEc:spr:annopr:v:291:y:2020:i:1:d:10.1007_s10479-018-3041-6
    DOI: 10.1007/s10479-018-3041-6
    as

    Download full text from publisher

    File URL: http://link.springer.com/10.1007/s10479-018-3041-6
    File Function: Abstract
    Download Restriction: Access to the full text of the articles in this series is restricted.

    File URL: https://libkey.io/10.1007/s10479-018-3041-6?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Morton I. Kamien & Lode Li, 1990. "Subcontracting, Coordination, Flexibility, and Production Smoothing in Aggregate Planning," Management Science, INFORMS, vol. 36(11), pages 1352-1363, November.
    2. Tsan-Ming Choi & T. C. E. Cheng & Xiande Zhao & Tsan-Ming Choi & T. C. E. Cheng & Xiande Zhao, 2016. "Multi-Methodological Research in Operations Management," Production and Operations Management, Production and Operations Management Society, vol. 25(3), pages 379-389, March.
    3. Guan, Xu & Ma, Shihua & Yin, Zhe, 2015. "The impact of hybrid push–pull contract in a decentralized assembly system," Omega, Elsevier, vol. 50(C), pages 70-81.
    4. Lucy Gongtao Chen & Ding Ding & Jihong Ou, 2014. "Power Structure and Profitability in Assembly Supply Chains," Production and Operations Management, Production and Operations Management Society, vol. 23(9), pages 1599-1616, September.
    5. Li, Xiang & Li, Yongjian & Cai, Xiaoqiang, 2013. "Double marginalization and coordination in the supply chain with uncertain supply," European Journal of Operational Research, Elsevier, vol. 226(2), pages 228-236.
    6. Xiang Fang & Kut C. So & Yunzeng Wang, 2008. "Component Procurement Strategies in Decentralized Assemble-to-Order Systems with Time-Dependent Pricing," Management Science, INFORMS, vol. 54(12), pages 1997-2011, December.
    7. Mahesh Nagarajan & Yehuda Bassok, 2008. "A Bargaining Framework in Supply Chains: The Assembly Problem," Management Science, INFORMS, vol. 54(8), pages 1482-1496, August.
    8. Leng, Mingming & Parlar, Mahmut, 2010. "Game-theoretic analyses of decentralized assembly supply chains: Non-cooperative equilibria vs. coordination with cost-sharing contracts," European Journal of Operational Research, Elsevier, vol. 204(1), pages 96-104, July.
    9. Fernando Bernstein & Gregory A. DeCroix, 2004. "Decentralized Pricing and Capacity Decisions in a Multitier System with Modular Assembly," Management Science, INFORMS, vol. 50(9), pages 1293-1308, September.
    10. Pritee Ray & Mamata Jenamani, 2016. "Sourcing decision under disruption risk with supply and demand uncertainty: A newsvendor approach," Annals of Operations Research, Springer, vol. 237(1), pages 237-262, February.
    11. Yunzeng Wang & Yigal Gerchak, 2003. "Capacity Games in Assembly Systems with Uncertain Demand," Manufacturing & Service Operations Management, INFORMS, vol. 5(3), pages 252-267, January.
    12. Yanling Feng & Guo Li & Suresh P. Sethi, 2018. "Pull and push contracts in a decentralised assembly system with random component yields," International Journal of Production Research, Taylor & Francis Journals, vol. 56(24), pages 7405-7425, December.
    13. Ashesh Kumar Sinha & Ananth Krishnamurthy, 2016. "Dual index production and subcontracting policies for assemble-to-order systems," IISE Transactions, Taylor & Francis Journals, vol. 48(5), pages 415-427, May.
    14. Gurnani, Haresh & Gerchak, Yigal, 2007. "Coordination in decentralized assembly systems with uncertain component yields," European Journal of Operational Research, Elsevier, vol. 176(3), pages 1559-1576, February.
    15. Xu Guan & Guo Li & Zhe Yin, 2016. "The implication of time-based payment contract in the decentralized assembly system," Annals of Operations Research, Springer, vol. 240(2), pages 641-659, May.
    16. Chu, Hongsheng & Wang, Jingchun & Jin, Yihui & Suo, Hansheng, 2006. "Decentralized inventory control in a two-component assembly system," International Journal of Production Economics, Elsevier, vol. 102(2), pages 255-264, August.
    17. Gérard P. Cachon, 2004. "The Allocation of Inventory Risk in a Supply Chain: Push, Pull, and Advance-Purchase Discount Contracts," Management Science, INFORMS, vol. 50(2), pages 222-238, February.
    18. Richard Saouma, 2008. "Optimal Second-Stage Outsourcing," Management Science, INFORMS, vol. 54(6), pages 1147-1159, June.
    19. Daniel Granot & Shuya Yin, 2008. "Competition and Cooperation in Decentralized Push and Pull Assembly Systems," Management Science, INFORMS, vol. 54(4), pages 733-747, April.
    20. Xu Guan & Guo Li & Suresh Pal Sethi, 2016. "The implication of vendor inventory liability period in a decentralised assembly system," International Journal of Production Research, Taylor & Francis Journals, vol. 54(17), pages 5029-5044, September.
    21. Luo, Zheng & Chen, Xu & Chen, Jing & Wang, Xiaojun, 2017. "Optimal pricing policies for differentiated brands under different supply chain power structures," European Journal of Operational Research, Elsevier, vol. 259(2), pages 437-451.
    22. Guo Li & Hui Mao & Lei Xiao, 2017. "Impacts of Leader–Follower Structure on Pricing and Production Strategies in a Decentralized Assembly System," Asia-Pacific Journal of Operational Research (APJOR), World Scientific Publishing Co. Pte. Ltd., vol. 34(01), pages 1-24, February.
    23. Edirisinghe, N.C.P. & Bichescu, B. & Shi, X., 2011. "Equilibrium analysis of supply chain structures under power imbalance," European Journal of Operational Research, Elsevier, vol. 214(3), pages 568-578, November.
    24. Yu, Dennis Z. & Cheong, Taesu & Sun, Daewon, 2017. "Impact of supply chain power and drop-shipping on a manufacturer’s optimal distribution channel strategy," European Journal of Operational Research, Elsevier, vol. 259(2), pages 554-563.
    25. Li Jiang, 2015. "Managing Supplier Competition and Sourcing Sequence for Component Manufacturing," Production and Operations Management, Production and Operations Management Society, vol. 24(2), pages 287-310, February.
    26. George J. Kyparisis & Christos Koulamas, 2016. "Assembly Systems with Sequential Supplier Decisions and Uncertain Demand," Production and Operations Management, Production and Operations Management Society, vol. 25(8), pages 1404-1414, August.
    27. Li Jiang & Yunzeng Wang, 2010. "Supplier Competition in Decentralized Assembly Systems with Price-Sensitive and Uncertain Demand," Manufacturing & Service Operations Management, INFORMS, vol. 12(1), pages 93-101, January.
    28. Wenting Pan & Kut C. So, 2010. "TECHNICAL NOTE---Optimal Product Pricing and Component Production Quantities for an Assembly System Under Supply Uncertainty," Operations Research, INFORMS, vol. 58(6), pages 1792-1797, December.
    29. Pritee Ray & Mamata Jenamani, 2016. "Sourcing decision under disruption risk with supply and demand uncertainty: A newsvendor approach," Annals of Operations Research, Springer, vol. 237(1), pages 237-262, February.
    30. Gérard P. Cachon & Martin A. Lariviere, 2005. "Supply Chain Coordination with Revenue-Sharing Contracts: Strengths and Limitations," Management Science, INFORMS, vol. 51(1), pages 30-44, January.
    31. Mahesh Nagarajan & Greys Sošić, 2009. "Coalition Stability in Assembly Models," Operations Research, INFORMS, vol. 57(1), pages 131-145, February.
    32. Guo Li & Xu Guan & Samar K Mukhopadhyay, 2016. "The impact of decision timing on the suppliers’ interactions: simultaneous moves versus sequential moves," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 67(2), pages 248-258, February.
    33. Fei Lv & Shihua Ma & Xu Guan, 2015. "The implication of capacity reservation contracts in assembly system with asymmetric demand information," International Journal of Production Research, Taylor & Francis Journals, vol. 53(18), pages 5564-5591, September.
    34. Kim, Bowon, 2003. "Dynamic outsourcing to contract manufacturers with different capabilities of reducing the supply cost," International Journal of Production Economics, Elsevier, vol. 86(1), pages 63-80, October.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Fang Huang & Honghua Hu & Han Song & Haiyan Li & Shasha Zhang & Jia Zhai, 2023. "Allocation of the Carbon Emission Abatement Target in Low Carbon Supply Chain Considering Power Structure," Sustainability, MDPI, vol. 15(13), pages 1-19, July.
    2. Janosch Brinker & Hans-Dietrich Haasis, 2022. "Power in the Context of SCM and Supply Chain Digitalization: An Overview from a Literature Review," Logistics, MDPI, vol. 6(2), pages 1-19, March.
    3. Qiu, Ruozhen & Li, Xuge & Sun, Minghe, 2023. "Vertical integration of an online secondhand platform and a recycling platform under different power structures," European Journal of Operational Research, Elsevier, vol. 310(1), pages 286-301.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Guo Li & Hui Mao & Lei Xiao, 2017. "Impacts of Leader–Follower Structure on Pricing and Production Strategies in a Decentralized Assembly System," Asia-Pacific Journal of Operational Research (APJOR), World Scientific Publishing Co. Pte. Ltd., vol. 34(01), pages 1-24, February.
    2. Fu, Hong & Ma, Yongkai & Cai, Xiaoqiang, 2018. "Downstream firm’s investment with equity holding in decentralized assembly systems," Omega, Elsevier, vol. 75(C), pages 27-56.
    3. Li, Tingting & Chen, Junlin, 2020. "Alliance formation in assembly systems with quality-improvement incentives," European Journal of Operational Research, Elsevier, vol. 285(3), pages 931-940.
    4. He, Yong & Zhao, Xuan & Krishnan, Harish & Jin, Shibo, 2022. "Cooperation among suppliers of complementary products in repeated interactions," International Journal of Production Economics, Elsevier, vol. 252(C).
    5. Changwen Li & Bin Cao & Yong-Wu Zhou & T. C. Edwin Cheng, 2023. "Pricing, coalition stability, and profit allocation in the pull assembly supply chains under competition," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 45(3), pages 977-1011, September.
    6. Yuhong He & Shuya Yin, 2015. "Joint Selling of Complementary Components Under Brand and Retail Competition," Manufacturing & Service Operations Management, INFORMS, vol. 17(4), pages 470-479, October.
    7. Amirmohsen Golmohammadi & Alireza Tajbakhsh & Mohamed Dia & Pawoumodom M. Takouda, 2022. "Effect of timing on reliability improvement and ordering decisions in a decentralized assembly system," Annals of Operations Research, Springer, vol. 312(1), pages 159-192, May.
    8. Li Jiang & Yunzeng Wang, 2010. "Supplier Competition in Decentralized Assembly Systems with Price-Sensitive and Uncertain Demand," Manufacturing & Service Operations Management, INFORMS, vol. 12(1), pages 93-101, January.
    9. Xiang Fang, 2012. "Capacity games for partially complementary products under multivariate random demands," Naval Research Logistics (NRL), John Wiley & Sons, vol. 59(2), pages 146-159, March.
    10. Guan, Xu & Ma, Shihua & Yin, Zhe, 2015. "The impact of hybrid push–pull contract in a decentralized assembly system," Omega, Elsevier, vol. 50(C), pages 70-81.
    11. Guo Li & Mengqi Liu & Xu Guan, 2017. "Diversity of payment contracts in a decentralized assembly system," Annals of Operations Research, Springer, vol. 257(1), pages 613-639, October.
    12. Retsef Levi & Georgia Perakis & Cong Shi & Wei Sun, 2020. "Strategic Capacity Planning Problems in Revenue‐Sharing Joint Ventures," Production and Operations Management, Production and Operations Management Society, vol. 29(3), pages 664-687, March.
    13. Daniel Granot & Shuya Yin, 2008. "Competition and Cooperation in Decentralized Push and Pull Assembly Systems," Management Science, INFORMS, vol. 54(4), pages 733-747, April.
    14. Xiao Huang & Tamer Boyacı & Mehmet Gümüş & Saibal Ray & Dan Zhang, 2016. "United We Stand or Divided We Stand? Strategic Supplier Alliances Under Order Default Risk," Management Science, INFORMS, vol. 62(5), pages 1297-1315, May.
    15. Aadhaar Chaturvedi, 2023. "Contracting with multiple suppliers: A multi‐item buyer's make versus buy decision," Production and Operations Management, Production and Operations Management Society, vol. 32(2), pages 434-448, February.
    16. Lan, Yanfei & Cai, Xiaoqiang & Shang, Changjing & Zhang, Lianmin & Zhao, Ruiqing, 2020. "Heterogeneous suppliers’ contract design in assembly systems with asymmetric information," European Journal of Operational Research, Elsevier, vol. 286(1), pages 149-163.
    17. Shuya Yin, 2010. "Alliance Formation Among Perfectly Complementary Suppliers in a Price-Sensitive Assembly System," Manufacturing & Service Operations Management, INFORMS, vol. 12(3), pages 527-544, October.
    18. Mahesh Nagarajan & Greys Sošić & Chunyang Tong, 2019. "Dynamic Stable Supplier Coalitions and Invariance in Assembly Systems with Commodity Components," Operations Research, INFORMS, vol. 67(5), pages 1269-1282, September.
    19. Başak Kalkancı & Feryal Erhun, 2012. "Pricing Games and Impact of Private Demand Information in Decentralized Assembly Systems," Operations Research, INFORMS, vol. 60(5), pages 1142-1156, October.
    20. Xu Guan & Guo Li & Zhe Yin, 2016. "The implication of time-based payment contract in the decentralized assembly system," Annals of Operations Research, Springer, vol. 240(2), pages 641-659, May.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:annopr:v:291:y:2020:i:1:d:10.1007_s10479-018-3041-6. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.