IDEAS home Printed from https://ideas.repec.org/a/pal/jorsoc/v68y2017i6d10.1057_s41274-016-0108-0.html
   My bibliography  Save this article

On sourcing and stocking policies in a two-echelon, multiple location, repairable parts supply chain

Author

Listed:
  • Izack Cohen

    (The Technion)

  • Morris A. Cohen

    (The Wharton School)

  • Elad Landau

    (The Technion)

Abstract

This research develops policies to minimize spare part purchases and repair costs for maintaining a fleet of mission-critical systems that operate from multiple forward (base) locations within a two-echelon repairable supply chain with a central depot. We take a tactical planning perspective to support periodic decisions for spare part purchases and repair sourcing, where the repair capabilities of the various locations are overlapping. We consider three policy classes: a central policy, where all repairs are sourced to a central depot; a local policy, whereby failures are repaired at forward locations; and a mixed policy, where a fraction of the parts is repaired at the bases and the remainder is repaired at the depot. Parts are classified based on their repair cost and lead time. For each part class, we suggest a solution that is based on threshold policies or on the use of a heuristic solution algorithm that extends the industry standard of marginal analysis to determine spare parts positioning by including repair fraction sourcing. A validation study shows that the suggested heuristic performs well compared to an exhaustive search (an average 0.2% difference in cost). An extensive numerical study demonstrates that the algorithm achieves costs which are lower by about 7–12% on average, compared to common, rule-based sourcing policies.

Suggested Citation

  • Izack Cohen & Morris A. Cohen & Elad Landau, 2017. "On sourcing and stocking policies in a two-echelon, multiple location, repairable parts supply chain," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 68(6), pages 617-629, June.
  • Handle: RePEc:pal:jorsoc:v:68:y:2017:i:6:d:10.1057_s41274-016-0108-0
    DOI: 10.1057/s41274-016-0108-0
    as

    Download full text from publisher

    File URL: http://link.springer.com/10.1057/s41274-016-0108-0
    File Function: Abstract
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1057/s41274-016-0108-0?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Geert-Jan van Houtum & Bram Kranenburg, 2015. "Spare Parts Inventory Control under System Availability Constraints," International Series in Operations Research and Management Science, Springer, edition 127, number 978-1-4899-7609-3, December.
    2. Alfredsson, Patrik, 1997. "Optimization of multi-echelon repairable item inventory systems with simultaneous location of repair facilities," European Journal of Operational Research, Elsevier, vol. 99(3), pages 584-595, June.
    3. Haritha Saranga & U. Kumar, 2006. "“Optimization of aircraft maintenance/support infrastructure using genetic algorithms—level of repair analysis”," Annals of Operations Research, Springer, vol. 143(1), pages 91-106, March.
    4. Basten, R.J.I. & van der Heijden, M.C. & Schutten, J.M.J., 2011. "A minimum cost flow model for level of repair analysis," International Journal of Production Economics, Elsevier, vol. 133(1), pages 233-242, September.
    5. Morris A. Cohen & Paul R. Kleindorfer & Hau L. Lee, 1988. "Service Constrained (s, S) Inventory Systems with Priority Demand Classes and Lost Sales," Management Science, INFORMS, vol. 34(4), pages 482-499, April.
    6. Kathryn E. Caggiano & John A. Muckstadt & James A. Rappold, 2006. "Integrated Real-Time Capacity and Inventory Allocation for Reparable Service Parts in a Two-Echelon Supply System," Manufacturing & Service Operations Management, INFORMS, vol. 8(3), pages 292-319, August.
    7. R. M. Simon, 1971. "Stationary Properties of a Two-Echelon Inventory Model for Low Demand Items," Operations Research, INFORMS, vol. 19(3), pages 761-773, June.
    8. Basten, R.J.I. & van der Heijden, M.C. & Schutten, J.M.J., 2011. "Practical extensions to a minimum cost flow model for level of repair analysis," European Journal of Operational Research, Elsevier, vol. 211(2), pages 333-342, June.
    9. Craig C. Sherbrooke, 1968. "Metric: A Multi-Echelon Technique for Recoverable Item Control," Operations Research, INFORMS, vol. 16(1), pages 122-141, February.
    10. Hau L. Lee, 1987. "A Multi-Echelon Inventory Model for Repairable Items with Emergency Lateral Transshipments," Management Science, INFORMS, vol. 33(10), pages 1302-1316, October.
    11. Rappold, James A. & Van Roo, Ben D., 2009. "Designing multi-echelon service parts networks with finite repair capacity," European Journal of Operational Research, Elsevier, vol. 199(3), pages 781-792, December.
    12. Stephen C. Graves, 1985. "A Multi-Echelon Inventory Model for a Repairable Item with One-for-One Replenishment," Management Science, INFORMS, vol. 31(10), pages 1247-1256, October.
    13. Yunzeng Wang & Morris A. Cohen & Yu-Sheng Zheng, 2000. "A Two-Echelon Repairable Inventory System with Stocking-Center-Dependent Depot Replenishment Lead Times," Management Science, INFORMS, vol. 46(11), pages 1441-1453, November.
    14. R. Basten & M. Heijden & J. Schutten & E. Kutanoglu, 2015. "An approximate approach for the joint problem of level of repair analysis and spare parts stocking," Annals of Operations Research, Springer, vol. 224(1), pages 121-145, January.
    15. Muller, Alexandre & Crespo Marquez, Adolfo & Iung, Benoît, 2008. "On the concept of e-maintenance: Review and current research," Reliability Engineering and System Safety, Elsevier, vol. 93(8), pages 1165-1187.
    16. Jose A. Guajardo & Morris A. Cohen & Sang-Hyun Kim & Serguei Netessine, 2012. "Impact of Performance-Based Contracting on Product Reliability: An Empirical Analysis," Management Science, INFORMS, vol. 58(5), pages 961-979, May.
    17. G. J. Feeney & C. C. Sherbrooke, 1966. "The (S - 1, S) Inventory Policy Under Compound Poisson Demand," Management Science, INFORMS, vol. 12(5), pages 391-411, January.
    18. Basten, R.J.I. & van der Heijden, M.C. & Schutten, J.M.J., 2012. "Joint optimization of level of repair analysis and spare parts stocks," European Journal of Operational Research, Elsevier, vol. 222(3), pages 474-483.
    19. R. Basten & J. Schutten & M. Heijden, 2009. "An efficient model formulation for level of repair analysis," Annals of Operations Research, Springer, vol. 172(1), pages 119-142, November.
    20. John A. Muckstadt, 1973. "A Model for a Multi-Item, Multi-Echelon, Multi-Indenture Inventory System," Management Science, INFORMS, vol. 20(4-Part-I), pages 472-481, December.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Jose A. Guajardo & Morris A. Cohen, 2018. "Service Differentiation and Operating Segments: A Framework and an Application to After-Sales Services," Manufacturing & Service Operations Management, INFORMS, vol. 20(3), pages 440-454, July.
    2. Qin, Xuwei & Jiang, Zhong-Zhong & Sun, Minghe & Tang, Liang & Liu, Xiaoran, 2021. "Repairable spare parts provisioning for multiregional expanding fleets of equipment under performance-based contracting," Omega, Elsevier, vol. 102(C).

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. de Kok, Ton & Grob, Christopher & Laumanns, Marco & Minner, Stefan & Rambau, Jörg & Schade, Konrad, 2018. "A typology and literature review on stochastic multi-echelon inventory models," European Journal of Operational Research, Elsevier, vol. 269(3), pages 955-983.
    2. R. Basten & M. Heijden & J. Schutten & E. Kutanoglu, 2015. "An approximate approach for the joint problem of level of repair analysis and spare parts stocking," Annals of Operations Research, Springer, vol. 224(1), pages 121-145, January.
    3. Basten, R.J.I. & van der Heijden, M.C. & Schutten, J.M.J., 2012. "Joint optimization of level of repair analysis and spare parts stocks," European Journal of Operational Research, Elsevier, vol. 222(3), pages 474-483.
    4. Yazdekhasti, Amin & sharifzadeh, Shila & Ma, Junfeng, 2022. "A two-echelon two-indenture warranty distribution network development and optimization under batch-ordering inventory policy," International Journal of Production Economics, Elsevier, vol. 249(C).
    5. Vinayak Deshpande & Morris A. Cohen & Karen Donohue, 2003. "An Empirical Study of Service Differentiation for Weapon System Service Parts," Operations Research, INFORMS, vol. 51(4), pages 518-530, August.
    6. Patriarca, Riccardo & Costantino, Francesco & Di Gravio, Giulio & Tronci, Massimo, 2016. "Inventory optimization for a customer airline in a Performance Based Contract," Journal of Air Transport Management, Elsevier, vol. 57(C), pages 206-216.
    7. Qin, Xuwei & Shao, Lusheng & Jiang, Zhong-Zhong, 2020. "Contract design for equipment after-sales service with business interruption insurance," European Journal of Operational Research, Elsevier, vol. 284(1), pages 176-187.
    8. García-Benito, Juan Carlos & Martín-Peña, María-Luz, 2021. "A redistribution model with minimum backorders of spare parts: A proposal for the defence sector," European Journal of Operational Research, Elsevier, vol. 291(1), pages 178-193.
    9. Kathryn E. Caggiano & John A. Muckstadt & James A. Rappold, 2006. "Integrated Real-Time Capacity and Inventory Allocation for Reparable Service Parts in a Two-Echelon Supply System," Manufacturing & Service Operations Management, INFORMS, vol. 8(3), pages 292-319, August.
    10. Nowicki, David R. & Randall, Wesley S. & Ramirez-Marquez, Jose Emmanuel, 2012. "Improving the computational efficiency of metric-based spares algorithms," European Journal of Operational Research, Elsevier, vol. 219(2), pages 324-334.
    11. Guide, V. Daniel R. & Srivastava, Rajesh, 1997. "Repairable inventory theory: Models and applications," European Journal of Operational Research, Elsevier, vol. 102(1), pages 1-20, October.
    12. Jovan Grahovac & Amiya Chakravarty, 2001. "Sharing and Lateral Transshipment of Inventory in a Supply Chain with Expensive Low-Demand Items," Management Science, INFORMS, vol. 47(4), pages 579-594, April.
    13. Diks, E. B. & de Kok, A. G. & Lagodimos, A. G., 1996. "Multi-echelon systems: A service measure perspective," European Journal of Operational Research, Elsevier, vol. 95(2), pages 241-263, December.
    14. Yunzeng Wang & Morris A. Cohen & Yu-Sheng Zheng, 2000. "A Two-Echelon Repairable Inventory System with Stocking-Center-Dependent Depot Replenishment Lead Times," Management Science, INFORMS, vol. 46(11), pages 1441-1453, November.
    15. Amin Yazdekhasti & Yahia Zare Mehrjardi, 2020. "Two-echelon three-indenture warranty distribution network: a hybrid branch and bound, Monte-Carlo approach," Operational Research, Springer, vol. 20(2), pages 1113-1158, June.
    16. Rezaei Somarin, Aghil & Chen, Songlin & Asian, Sobhan & Wang, David Z.W., 2017. "A heuristic stock allocation rule for repairable service parts," International Journal of Production Economics, Elsevier, vol. 184(C), pages 131-140.
    17. Sheikh-Zadeh, Alireza & Rossetti, Manuel D. & Scott, Marc A., 2021. "Performance-based inventory classification methods for large-Scale multi-echelon replenishment systems," Omega, Elsevier, vol. 101(C).
    18. Fritzsche, R., 2012. "Cost adjustment for single item pooling models using a dynamic failure rate: A calculation for the aircraft industry," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 48(6), pages 1065-1079.
    19. Graves, Stephen C., 1989. "A multi-echelon inventory model with fixed reorder intervals," Working papers 3045-89., Massachusetts Institute of Technology (MIT), Sloan School of Management.
    20. Vinayak Deshpande & Ananth V. Iyer & Richard Cho, 2006. "Efficient Supply Chain Management at the U.S. Coast Guard Using Part-Age Dependent Supply Replenishment Policies," Operations Research, INFORMS, vol. 54(6), pages 1028-1040, December.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:pal:jorsoc:v:68:y:2017:i:6:d:10.1057_s41274-016-0108-0. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.palgrave-journals.com/ .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.