IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v140y2012i2p570-578.html
   My bibliography  Save this article

Criticality classification of spare parts: A case study

Author

Listed:
  • Molenaers, An
  • Baets, Herman
  • Pintelon, Liliane
  • Waeyenbergh, Geert

Abstract

This paper proposes a spare part classification method based on item criticality. Starting from a multi-criteria analysis, the proposed model converts relevant criteria impacting item criticality into a single score presenting the criticality level. The obtained criticality level is used to rationalize the efficiency of the spare parts inventory policy. The model presents the multi-criteria classification problem in a logic decision diagram where AHP is used to solve the multi-criteria decision sub-problems at the different decision nodes of the diagram. The method was tested and implemented in a petrochemical plant and the results of this case study are presented.

Suggested Citation

  • Molenaers, An & Baets, Herman & Pintelon, Liliane & Waeyenbergh, Geert, 2012. "Criticality classification of spare parts: A case study," International Journal of Production Economics, Elsevier, vol. 140(2), pages 570-578.
  • Handle: RePEc:eee:proeco:v:140:y:2012:i:2:p:570-578
    DOI: 10.1016/j.ijpe.2011.08.013
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925527311003549
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.ijpe.2011.08.013?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Ng, Wan Lung, 2007. "A simple classifier for multiple criteria ABC analysis," European Journal of Operational Research, Elsevier, vol. 177(1), pages 344-353, February.
    2. Zhou, Peng & Fan, Liwei, 2007. "A note on multi-criteria ABC inventory classification using weighted linear optimization," European Journal of Operational Research, Elsevier, vol. 182(3), pages 1488-1491, November.
    3. Huiskonen, Janne, 2001. "Maintenance spare parts logistics: Special characteristics and strategic choices," International Journal of Production Economics, Elsevier, vol. 71(1-3), pages 125-133, May.
    4. Gajpal, Prem Prakash & Ganesh, L. S. & Rajendran, Chandrasekharan, 1994. "Criticality analysis of spare parts using the analytic hierarchy process," International Journal of Production Economics, Elsevier, vol. 35(1-3), pages 293-297, June.
    5. Porras, Eric & Dekker, Rommert, 2008. "An inventory control system for spare parts at a refinery: An empirical comparison of different re-order point methods," European Journal of Operational Research, Elsevier, vol. 184(1), pages 101-132, January.
    6. Dekker, R. & Kleijn, M. J. & de Rooij, P. J., 1998. "A spare parts stocking policy based on equipment criticality," International Journal of Production Economics, Elsevier, vol. 56(1), pages 69-77, September.
    7. Jouni, Paakki & Huiskonen, Janne & Pirttilä, Timo, 2011. "Improving global spare parts distribution chain performance through part categorization: A case study," International Journal of Production Economics, Elsevier, vol. 133(1), pages 164-171, September.
    8. Kennedy, W. J. & Wayne Patterson, J. & Fredendall, Lawrence D., 2002. "An overview of recent literature on spare parts inventories," International Journal of Production Economics, Elsevier, vol. 76(2), pages 201-215, March.
    9. Waeyenbergh, Geert & Pintelon, Liliane, 2002. "A framework for maintenance concept development," International Journal of Production Economics, Elsevier, vol. 77(3), pages 299-313, June.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Binoy Debnath & Md Shihab Shakur & Fahmida Tanjum & M. Azizur Rahman & Ziaul Haq Adnan, 2022. "Impact of Additive Manufacturing on the Supply Chain of Aerospace Spare Parts Industry—A Review," Logistics, MDPI, vol. 6(2), pages 1-25, April.
    2. Hu, Qiwei & Boylan, John E. & Chen, Huijing & Labib, Ashraf, 2018. "OR in spare parts management: A review," European Journal of Operational Research, Elsevier, vol. 266(2), pages 395-414.
    3. Petropoulos, Fotios & Apiletti, Daniele & Assimakopoulos, Vassilios & Babai, Mohamed Zied & Barrow, Devon K. & Ben Taieb, Souhaib & Bergmeir, Christoph & Bessa, Ricardo J. & Bijak, Jakub & Boylan, Joh, 2022. "Forecasting: theory and practice," International Journal of Forecasting, Elsevier, vol. 38(3), pages 705-871.
      • Fotios Petropoulos & Daniele Apiletti & Vassilios Assimakopoulos & Mohamed Zied Babai & Devon K. Barrow & Souhaib Ben Taieb & Christoph Bergmeir & Ricardo J. Bessa & Jakub Bijak & John E. Boylan & Jet, 2020. "Forecasting: theory and practice," Papers 2012.03854, arXiv.org, revised Jan 2022.
    4. Boliang Lin & Jiaxi Wang & Huasheng Wang & Zhongkai Wang & Jian Li & Ruixi Lin & Jie Xiao & Jianping Wu, 2017. "Inventory-transportation integrated optimization for maintenance spare parts of high-speed trains," PLOS ONE, Public Library of Science, vol. 12(5), pages 1-18, May.
    5. Reza Barabadi & Mohammad Ataei & Reza Khalokakaie & Ali Nouri Qarahasanlou, 2021. "Spare-part management in a heterogeneous environment," PLOS ONE, Public Library of Science, vol. 16(3), pages 1-14, March.
    6. Chekurov, Sergei & Metsä-Kortelainen, Sini & Salmi, Mika & Roda, Irene & Jussila, Ari, 2018. "The perceived value of additively manufactured digital spare parts in industry: An empirical investigation," International Journal of Production Economics, Elsevier, vol. 205(C), pages 87-97.
    7. Natalie M. Scala & Jayant Rajgopal & Luis G. Vargas & Kim LaScola Needy, 2016. "Group Decision Making with Dispersion in the Analytic Hierarchy Process," Group Decision and Negotiation, Springer, vol. 25(2), pages 355-372, March.
    8. Hung, Yi-Feng & Hsiao, Jui-Yi, 2013. "Inventory rationing decision models during replenishment lead time," International Journal of Production Economics, Elsevier, vol. 144(1), pages 290-300.
    9. Sheikh-Zadeh, Alireza & Rossetti, Manuel D. & Scott, Marc A., 2021. "Performance-based inventory classification methods for large-Scale multi-echelon replenishment systems," Omega, Elsevier, vol. 101(C).
    10. Petchrompo, Sanyapong & Parlikad, Ajith Kumar, 2019. "A review of asset management literature on multi-asset systems," Reliability Engineering and System Safety, Elsevier, vol. 181(C), pages 181-201.
    11. Jan Block & Alireza Ahmadi & Xun Xiao & Uday Kumar, 2019. "Spares provisioning strategy for periodically replaced units within the fleet retirement period," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 10(3), pages 299-315, June.
    12. Yang, Liu & Li, Haitao & Campbell, James F. & Sweeney, Donald C., 2017. "Integrated multi-period dynamic inventory classification and control," International Journal of Production Economics, Elsevier, vol. 189(C), pages 86-96.
    13. Javier Serra Parajes & Adolfo Crespo Márquez & Antonio Sola Rosique, 2018. "Criticality analysis for preventive maintenance optimization purposes in gas network infrastructures," Journal of Risk and Reliability, , vol. 232(4), pages 464-472, August.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Bacchetti, A. & Plebani, F. & Saccani, N. & Syntetos, A.A., 2013. "Empirically-driven hierarchical classification of stock keeping units," International Journal of Production Economics, Elsevier, vol. 143(2), pages 263-274.
    2. Hu, Qiwei & Boylan, John E. & Chen, Huijing & Labib, Ashraf, 2018. "OR in spare parts management: A review," European Journal of Operational Research, Elsevier, vol. 266(2), pages 395-414.
    3. Bacchetti, Andrea & Saccani, Nicola, 2012. "Spare parts classification and demand forecasting for stock control: Investigating the gap between research and practice," Omega, Elsevier, vol. 40(6), pages 722-737.
    4. Mohammaditabar, Davood & Hassan Ghodsypour, Seyed & O'Brien, Chris, 2012. "Inventory control system design by integrating inventory classification and policy selection," International Journal of Production Economics, Elsevier, vol. 140(2), pages 655-659.
    5. Dombi, József & Jónás, Tamás & Tóth, Zsuzsanna Eszter, 2018. "Modeling and long-term forecasting demand in spare parts logistics businesses," International Journal of Production Economics, Elsevier, vol. 201(C), pages 1-17.
    6. Hu, Qiwei & Chakhar, Salem & Siraj, Sajid & Labib, Ashraf, 2017. "Spare parts classification in industrial manufacturing using the dominance-based rough set approach," European Journal of Operational Research, Elsevier, vol. 262(3), pages 1136-1163.
    7. Sheikh-Zadeh, Alireza & Rossetti, Manuel D. & Scott, Marc A., 2021. "Performance-based inventory classification methods for large-Scale multi-echelon replenishment systems," Omega, Elsevier, vol. 101(C).
    8. Katarzyna Grondys, 2013. "Theory Of Spare Parts Inventory Management For Production Equipment," Advanced Logistic systems, University of Miskolc, Department of Material Handling and Logistics, vol. 7(1), pages 37-42, December.
    9. R. Sundarraj, 2006. "A model for standardizing human decisions concerning service-contracts management," Annals of Operations Research, Springer, vol. 143(1), pages 171-189, March.
    10. Siamak Kheybari & S. Ali Naji & Fariba Mahdi Rezaie & Reza Salehpour, 2019. "ABC classification according to Pareto’s principle: a hybrid methodology," OPSEARCH, Springer;Operational Research Society of India, vol. 56(2), pages 539-562, June.
    11. Christopher A. Boone & Benjamin T. Hazen & Joseph B. Skipper & Robert E. Overstreet, 2018. "A framework for investigating optimization of service parts performance with big data," Annals of Operations Research, Springer, vol. 270(1), pages 65-74, November.
    12. Lolli, F. & Ishizaka, A. & Gamberini, R., 2014. "New AHP-based approaches for multi-criteria inventory classification," International Journal of Production Economics, Elsevier, vol. 156(C), pages 62-74.
    13. Feyzan Arikan & Senay Citak, 2017. "Multiple Criteria Inventory Classification in an Electronics Firm," International Journal of Information Technology & Decision Making (IJITDM), World Scientific Publishing Co. Pte. Ltd., vol. 16(02), pages 315-331, March.
    14. Zhu, Sha & Dekker, Rommert & van Jaarsveld, Willem & Renjie, Rex Wang & Koning, Alex J., 2017. "An improved method for forecasting spare parts demand using extreme value theory," European Journal of Operational Research, Elsevier, vol. 261(1), pages 169-181.
    15. Wang, Wenbin & Syntetos, Aris A., 2011. "Spare parts demand: Linking forecasting to equipment maintenance," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 47(6), pages 1194-1209.
    16. Z S Hua & B Zhang & J Yang & D S Tan, 2007. "A new approach of forecasting intermittent demand for spare parts inventories in the process industries," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 58(1), pages 52-61, January.
    17. Levner, Eugene & Perlman, Yael & Cheng, T.C.E. & Levner, Ilya, 2011. "A network approach to modeling the multi-echelon spare-part inventory system with backorders and interval-valued demand," International Journal of Production Economics, Elsevier, vol. 132(1), pages 43-51, July.
    18. Sisi Wu & Yelin Fu & K. K. Lai & W. K. John Leung, 2018. "A Weighted Least-Square Dissimilarity Approach for Multiple Criteria ABC Inventory Classification," Asia-Pacific Journal of Operational Research (APJOR), World Scientific Publishing Co. Pte. Ltd., vol. 35(04), pages 1-12, August.
    19. Tsai, Chi-Yang & Yeh, Szu-Wei, 2008. "A multiple objective particle swarm optimization approach for inventory classification," International Journal of Production Economics, Elsevier, vol. 114(2), pages 656-666, August.
    20. Chekurov, Sergei & Metsä-Kortelainen, Sini & Salmi, Mika & Roda, Irene & Jussila, Ari, 2018. "The perceived value of additively manufactured digital spare parts in industry: An empirical investigation," International Journal of Production Economics, Elsevier, vol. 205(C), pages 87-97.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:140:y:2012:i:2:p:570-578. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.