IDEAS home Printed from https://ideas.repec.org/a/eee/ejores/v315y2024i3p821-843.html
   My bibliography  Save this article

Scheduling in manufacturing with transportation: Classification and solution techniques

Author

Listed:
  • Hosseini, Amir
  • Otto, Alena
  • Pesch, Erwin

Abstract

Many modern manufacturing settings feature especially close relationship of the transportation of workpieces between production steps with the scheduling of manufacturing operations. Consider flexible manufacturing systems, reconfigurable manufacturing systems or flexible assembly lines, to name a few. In this paper, we review over 140 papers on scheduling problems in manufacturing with transportation (SchedPT). We classify the reviewed papers according to an extension of the three-field notation of Graham et al. (1979) and outline relevant problem settings, such as characteristics of transporters, material flow or of the buffer system. Afterwards, we discuss selected main solution approaches to solve SchedPT. We also collected more than 60 results on polynomially solvable problem variants and performance guarantees. Based on our analysis, we formulate promising directions for future research.

Suggested Citation

  • Hosseini, Amir & Otto, Alena & Pesch, Erwin, 2024. "Scheduling in manufacturing with transportation: Classification and solution techniques," European Journal of Operational Research, Elsevier, vol. 315(3), pages 821-843.
  • Handle: RePEc:eee:ejores:v:315:y:2024:i:3:p:821-843
    DOI: 10.1016/j.ejor.2023.10.013
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0377221723007701
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.ejor.2023.10.013?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Valerie Botta-Genoulaz, 2000. "Hybrid flow shop scheduling with precedence constraints and time lags to minimize maximum lateness," Post-Print hal-00398647, HAL.
    2. Allahverdi, Ali, 2015. "The third comprehensive survey on scheduling problems with setup times/costs," European Journal of Operational Research, Elsevier, vol. 246(2), pages 345-378.
    3. Irina N. Lushchakova & Alan J. Soper & Vitaly A. Strusevich, 2009. "Transporting jobs through a two‐machine open shop," Naval Research Logistics (NRL), John Wiley & Sons, vol. 56(1), pages 1-18, February.
    4. Sawik, Tadeusz, 1998. "A lexicographic approach to bi-objective loading of a flexible assembly system," European Journal of Operational Research, Elsevier, vol. 107(3), pages 656-668, June.
    5. Andy Ham, 2021. "Transfer-robot task scheduling in job shop," International Journal of Production Research, Taylor & Francis Journals, vol. 59(3), pages 813-823, February.
    6. Blazewicz, Jacek & Domschke, Wolfgang & Pesch, Erwin, 1996. "The job shop scheduling problem: Conventional and new solution techniques," European Journal of Operational Research, Elsevier, vol. 93(1), pages 1-33, August.
    7. Fontes, Dalila B.M.M. & Homayouni, S. Mahdi & Gonçalves, José F., 2023. "A hybrid particle swarm optimization and simulated annealing algorithm for the job shop scheduling problem with transport resources," European Journal of Operational Research, Elsevier, vol. 306(3), pages 1140-1157.
    8. Carlier, Jacques, 1982. "The one-machine sequencing problem," European Journal of Operational Research, Elsevier, vol. 11(1), pages 42-47, September.
    9. Pan, Quan-Ke, 2016. "An effective co-evolutionary artificial bee colony algorithm for steelmaking-continuous casting scheduling," European Journal of Operational Research, Elsevier, vol. 250(3), pages 702-714.
    10. Yantong Li & Jean-François Côté & Leandro Callegari-Coelho & Peng Wu, 2022. "Novel Formulations and Logic-Based Benders Decomposition for the Integrated Parallel Machine Scheduling and Location Problem," INFORMS Journal on Computing, INFORMS, vol. 34(2), pages 1048-1069, March.
    11. Gunasekaran, A. & Martikainen, T. & Yli-Olli, P., 1993. "Flexible manufacturing systems: An investigation for research and applications," European Journal of Operational Research, Elsevier, vol. 66(1), pages 1-26, April.
    12. Weibo Ren & Yan Yan & Yaoguang Hu & Yu Guan, 2022. "Joint optimisation for dynamic flexible job-shop scheduling problem with transportation time and resource constraints," International Journal of Production Research, Taylor & Francis Journals, vol. 60(18), pages 5675-5696, September.
    13. Jenny Nossack & Dirk Briskorn & Erwin Pesch, 2018. "Container Dispatching and Conflict-Free Yard Crane Routing in an Automated Container Terminal," Transportation Science, INFORMS, vol. 52(5), pages 1059-1076, October.
    14. Sarin, Subhash C. & Kalir, Adar A. & Chen, Ming, 2008. "A single-lot, unified cost-based flow shop lot-streaming problem," International Journal of Production Economics, Elsevier, vol. 113(1), pages 413-424, May.
    15. Kizilay, Damla & Hentenryck, Pascal Van & Eliiyi, Deniz T., 2020. "Constraint programming models for integrated container terminal operations," European Journal of Operational Research, Elsevier, vol. 286(3), pages 945-962.
    16. Hall, Nicholas G. & Kamoun, Hichem & Sriskandarajah, Chelliah, 1998. "Scheduling in robotic cells: Complexity and steady state analysis," European Journal of Operational Research, Elsevier, vol. 109(1), pages 43-65, August.
    17. Tava Lennon Olsen & Brian Tomlin, 2020. "Industry 4.0: Opportunities and Challenges for Operations Management," Manufacturing & Service Operations Management, INFORMS, vol. 22(1), pages 113-122, January.
    18. Ruilin Pan & Qiong Wang & Zhenghong Li & Jianhua Cao & Yongjin Zhang, 2022. "Steelmaking-continuous casting scheduling problem with multi-position refining furnaces under time-of-use tariffs," Annals of Operations Research, Springer, vol. 310(1), pages 119-151, March.
    19. Zhang, Xiandong & van de Velde, Steef, 2010. "On-line two-machine open shop scheduling with time lags," European Journal of Operational Research, Elsevier, vol. 204(1), pages 14-19, July.
    20. Otto, Christian & Otto, Alena, 2014. "Multiple-source learning precedence graph concept for the automotive industry," European Journal of Operational Research, Elsevier, vol. 234(1), pages 253-265.
    21. John S. Morris & Richard J. Tersine, 1990. "A Simulation Analysis of Factors Influencing the Attractiveness of Group Technology Cellular Layouts," Management Science, INFORMS, vol. 36(12), pages 1567-1578, December.
    22. Alessandro Agnetis & Claudio Arbib, 1997. "Concurrent operations assignment and sequencing for particular assembly problems in flow lines," Annals of Operations Research, Springer, vol. 69(0), pages 1-31, January.
    23. Lacomme, Philippe & Larabi, Mohand & Tchernev, Nikolay, 2013. "Job-shop based framework for simultaneous scheduling of machines and automated guided vehicles," International Journal of Production Economics, Elsevier, vol. 143(1), pages 24-34.
    24. Paulli, Jan, 1995. "A hierarchical approach for the FMS scheduling problem," European Journal of Operational Research, Elsevier, vol. 86(1), pages 32-42, October.
    25. Brucker, Peter & Knust, Sigrid & Wang, Guoqing, 2005. "Complexity results for flow-shop problems with a single server," European Journal of Operational Research, Elsevier, vol. 165(2), pages 398-407, September.
    26. Sicheng Zhang & T.N. Wong, 2016. "Studying the impact of sequence-dependent set-up times in integrated process planning and scheduling with E-ACO heuristic," International Journal of Production Research, Taylor & Francis Journals, vol. 54(16), pages 4815-4838, August.
    27. Antonina P. Khramova & Ilya Chernykh, 2021. "A new algorithm for the two-machine open shop and the polynomial solvability of a scheduling problem with routing," Journal of Scheduling, Springer, vol. 24(4), pages 405-412, August.
    28. Andreas Hottenrott & Martin Grunow, 2019. "Flexible layouts for the mixed-model assembly of heterogeneous vehicles," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 41(4), pages 943-979, December.
    29. Khayat, Ghada El & Langevin, Andre & Riopel, Diane, 2006. "Integrated production and material handling scheduling using mathematical programming and constraint programming," European Journal of Operational Research, Elsevier, vol. 175(3), pages 1818-1832, December.
    30. Caumond, A. & Lacomme, P. & Moukrim, A. & Tchernev, N., 2009. "An MILP for scheduling problems in an FMS with one vehicle," European Journal of Operational Research, Elsevier, vol. 199(3), pages 706-722, December.
    31. Bagchi, Tapan P. & Gupta, Jatinder N.D. & Sriskandarajah, Chelliah, 2006. "A review of TSP based approaches for flowshop scheduling," European Journal of Operational Research, Elsevier, vol. 169(3), pages 816-854, March.
    32. Zhang, Sicheng & Li, Xiang & Zhang, Bowen & Wang, Shouyang, 2020. "Multi-objective optimisation in flexible assembly job shop scheduling using a distributed ant colony system," European Journal of Operational Research, Elsevier, vol. 283(2), pages 441-460.
    33. Ming Liu & Xin Liu & E. Zhang & Feng Chu & Chengbin Chu, 2019. "Scenario-based heuristic to two-stage stochastic program for the parallel machine ScheLoc problem," International Journal of Production Research, Taylor & Francis Journals, vol. 57(6), pages 1706-1723, March.
    34. Yujun Yang & Ye Chen & Chuanze Long, 2016. "Flexible robotic manufacturing cell scheduling problem with multiple robots," International Journal of Production Research, Taylor & Francis Journals, vol. 54(22), pages 6768-6781, November.
    35. Jacek Blazewicz & Klaus H. Ecker & Erwin Pesch & Günter Schmidt & Malgorzata Sterna & Jan Weglarz, 2019. "Handbook on Scheduling," International Handbooks on Information Systems, Springer, edition 2, number 978-3-319-99849-7, December.
    36. Yoram Koren & Wencai Wang & Xi Gu, 2017. "Value creation through design for scalability of reconfigurable manufacturing systems," International Journal of Production Research, Taylor & Francis Journals, vol. 55(5), pages 1227-1242, March.
    37. Y. Crama & V. Kats & J. van de Klundert & E. Levner, 2000. "Cyclic scheduling in robotic flowshops," Annals of Operations Research, Springer, vol. 96(1), pages 97-124, November.
    38. Andreas Hottenrott & Maximilian Schiffer & Martin Grunow, 2023. "Flexible assembly layouts in smart manufacturing: An impact assessment for the automotive industry," IISE Transactions, Taylor & Francis Journals, vol. 55(11), pages 1144-1159, November.
    39. Edis, Emrah B. & Oguz, Ceyda & Ozkarahan, Irem, 2013. "Parallel machine scheduling with additional resources: Notation, classification, models and solution methods," European Journal of Operational Research, Elsevier, vol. 230(3), pages 449-463.
    40. Egon Balas, 1969. "Machine Sequencing Via Disjunctive Graphs: An Implicit Enumeration Algorithm," Operations Research, INFORMS, vol. 17(6), pages 941-957, December.
    41. Botta-Genoulaz, Valerie, 2000. "Hybrid flow shop scheduling with precedence constraints and time lags to minimize maximum lateness," International Journal of Production Economics, Elsevier, vol. 64(1-3), pages 101-111, March.
    42. Rossi, Andrea, 2014. "Flexible job shop scheduling with sequence-dependent setup and transportation times by ant colony with reinforced pheromone relationships," International Journal of Production Economics, Elsevier, vol. 153(C), pages 253-267.
    43. P. C. Gilmore & R. E. Gomory, 1964. "Sequencing a One State-Variable Machine: A Solvable Case of the Traveling Salesman Problem," Operations Research, INFORMS, vol. 12(5), pages 655-679, October.
    44. Sawik, Tadeusz, 2000. "An LP-based approach for loading and routing in a flexible assembly line," International Journal of Production Economics, Elsevier, vol. 64(1-3), pages 49-58, March.
    45. Fatemi-Anaraki, Soroush & Tavakkoli-Moghaddam, Reza & Foumani, Mehdi & Vahedi-Nouri, Behdin, 2023. "Scheduling of Multi-Robot Job Shop Systems in Dynamic Environments: Mixed-Integer Linear Programming and Constraint Programming Approaches," Omega, Elsevier, vol. 115(C).
    46. Paraskevopoulos, Dimitris C. & Laporte, Gilbert & Repoussis, Panagiotis P. & Tarantilis, Christos D., 2017. "Resource constrained routing and scheduling: Review and research prospects," European Journal of Operational Research, Elsevier, vol. 263(3), pages 737-754.
    47. Hans Kellerer & Alan J. Soper & Vitaly A. Strusevich, 2013. "Preemptive scheduling on two identical parallel machines with a single transporter," Journal of Combinatorial Optimization, Springer, vol. 25(2), pages 279-307, February.
    48. Peter Brucker & Sigrid Knust & T.C. Cheng & Natalia Shakhlevich, 2004. "Complexity Results for Flow-Shop and Open-Shop Scheduling Problems with Transportation Delays," Annals of Operations Research, Springer, vol. 129(1), pages 81-106, July.
    49. Joseph Adams & Egon Balas & Daniel Zawack, 1988. "The Shifting Bottleneck Procedure for Job Shop Scheduling," Management Science, INFORMS, vol. 34(3), pages 391-401, March.
    50. Boysen, Nils & Briskorn, Dirk & Meisel, Frank, 2017. "A generalized classification scheme for crane scheduling with interference," European Journal of Operational Research, Elsevier, vol. 258(1), pages 343-357.
    51. Giuseppe Fragapane & Dmitry Ivanov & Mirco Peron & Fabio Sgarbossa & Jan Ola Strandhagen, 2022. "Increasing flexibility and productivity in Industry 4.0 production networks with autonomous mobile robots and smart intralogistics," Annals of Operations Research, Springer, vol. 308(1), pages 125-143, January.
    52. Igor Averbakh & Oded Berman, 1999. "A Simple Heuristic for m-Machine Flow-Shop and its Applications in Routing-Scheduling Problems," Operations Research, INFORMS, vol. 47(1), pages 165-170, February.
    53. Matias Siebert & Kelly Bartlett & Haejoong Kim & Shabbir Ahmed & Junho Lee & Dima Nazzal & George Nemhauser & Joel Sokol, 2018. "Lot targeting and lot dispatching decision policies for semiconductor manufacturing: optimisation under uncertainty with simulation validation," International Journal of Production Research, Taylor & Francis Journals, vol. 56(1-2), pages 629-641, January.
    54. Igor Averbakh & Oded Berman, 1996. "Routing Two-Machine Flowshop Problems on Networks with Special Structure," Transportation Science, INFORMS, vol. 30(4), pages 303-314, November.
    55. En-da Jiang & Ling Wang, 2019. "An improved multi-objective evolutionary algorithm based on decomposition for energy-efficient permutation flow shop scheduling problem with sequence-dependent setup time," International Journal of Production Research, Taylor & Francis Journals, vol. 57(6), pages 1756-1771, March.
    56. Feng, Yanling & Li, Guo & Sethi, Suresh P., 2018. "A three-layer chromosome genetic algorithm for multi-cell scheduling with flexible routes and machine sharing," International Journal of Production Economics, Elsevier, vol. 196(C), pages 269-283.
    57. Sun, Defeng & Tang, Lixin & Baldacci, Roberto & Lim, Andrew, 2021. "An exact algorithm for the unidirectional quay crane scheduling problem with vessel stability," European Journal of Operational Research, Elsevier, vol. 291(1), pages 271-283.
    58. Ümit Bilge & Gündüz Ulusoy, 1995. "A Time Window Approach to Simultaneous Scheduling of Machines and Material Handling System in an FMS," Operations Research, INFORMS, vol. 43(6), pages 1058-1070, December.
    59. Chen, Bo & Lee, Chung-Yee, 2008. "Logistics scheduling with batching and transportation," European Journal of Operational Research, Elsevier, vol. 189(3), pages 871-876, September.
    60. J. Carlier & E. Pinson, 1989. "An Algorithm for Solving the Job-Shop Problem," Management Science, INFORMS, vol. 35(2), pages 164-176, February.
    61. J.M. van den Akker & C.A.J. Hurkens & M.W.P. Savelsbergh, 2000. "Time-Indexed Formulations for Machine Scheduling Problems: Column Generation," INFORMS Journal on Computing, INFORMS, vol. 12(2), pages 111-124, May.
    62. Allahverdi, Ali & Gupta, Jatinder N. D. & Aldowaisan, Tariq, 1999. "A review of scheduling research involving setup considerations," Omega, Elsevier, vol. 27(2), pages 219-239, April.
    63. Jianming Dong & Xueshi Wang & Jueliang Hu & Guohui Lin, 2016. "An improved two-machine flowshop scheduling with intermediate transportation," Journal of Combinatorial Optimization, Springer, vol. 31(3), pages 1316-1334, April.
    64. Schulz, Arne & Fliedner, Malte & Fiedrich, Benedikt & Pfeiffer, Christian, 2021. "Levelling crane workload in multi-yard rail-road container terminals," European Journal of Operational Research, Elsevier, vol. 293(3), pages 941-954.
    65. Feng Li & Lin Zhang & T. W. Liao & Yongkui Liu, 2019. "Multi-objective optimisation of multi-task scheduling in cloud manufacturing," International Journal of Production Research, Taylor & Francis Journals, vol. 57(12), pages 3847-3863, June.
    66. Celia A. Glass & Yakov M. Shafransky & Vitaly A. Strusevich, 2000. "Scheduling for parallel dedicated machines with a single server," Naval Research Logistics (NRL), John Wiley & Sons, vol. 47(4), pages 304-328, June.
    67. Ivens, Philip & Lambrecht, Marc, 1996. "Extending the shifting bottleneck procedure to real-life applications," European Journal of Operational Research, Elsevier, vol. 90(2), pages 252-268, April.
    68. Wiesław Kubiak, 2023. "On the complexity of open shop scheduling with time lags," Journal of Scheduling, Springer, vol. 26(3), pages 331-334, June.
    69. Hurink, Johann & Knust, Sigrid, 2005. "Tabu search algorithms for job-shop problems with a single transport robot," European Journal of Operational Research, Elsevier, vol. 162(1), pages 99-111, April.
    70. Xiaomei He & Shaohua Dong & Ning Zhao, 2020. "Research on rush order insertion rescheduling problem under hybrid flow shop based on NSGA-III," International Journal of Production Research, Taylor & Francis Journals, vol. 58(4), pages 1161-1177, February.
    71. Berghman, Lotte & Kergosien, Yannick & Billaut, Jean-Charles, 2023. "A review on integrated scheduling and outbound vehicle routing problems," European Journal of Operational Research, Elsevier, vol. 311(1), pages 1-23.
    72. Mejía, Gonzalo & Yuraszeck, Francisco, 2020. "A self-tuning variable neighborhood search algorithm and an effective decoding scheme for open shop scheduling problems with travel/setup times," European Journal of Operational Research, Elsevier, vol. 285(2), pages 484-496.
    73. Dominik Kress & Sebastian Meiswinkel & Erwin Pesch, 2018. "Mechanism design for machine scheduling problems: classification and literature overview," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 40(3), pages 583-611, July.
    74. Amir Ahmadi-Javid & Pedram Hooshangi-Tabrizi, 2015. "A mathematical formulation and anarchic society optimisation algorithms for integrated scheduling of processing and transportation operations in a flow-shop environment," International Journal of Production Research, Taylor & Francis Journals, vol. 53(19), pages 5988-6006, October.
    75. Andrzej Bożek & Frank Werner, 2018. "Flexible job shop scheduling with lot streaming and sublot size optimisation," International Journal of Production Research, Taylor & Francis Journals, vol. 56(19), pages 6391-6411, October.
    76. Ahmadian, Mohammad Mahdi & Khatami, Mostafa & Salehipour, Amir & Cheng, T.C.E., 2021. "Four decades of research on the open-shop scheduling problem to minimize the makespan," European Journal of Operational Research, Elsevier, vol. 295(2), pages 399-426.
    77. Liu, Jiyin & MacCarthy, B. L., 1997. "A global MILP model for FMS scheduling," European Journal of Operational Research, Elsevier, vol. 100(3), pages 441-453, August.
    78. Carlier, Jacques, 1987. "Scheduling jobs with release dates and tails on identical machines to minimize the makespan," European Journal of Operational Research, Elsevier, vol. 29(3), pages 298-306, June.
    79. Allahverdi, Ali & Ng, C.T. & Cheng, T.C.E. & Kovalyov, Mikhail Y., 2008. "A survey of scheduling problems with setup times or costs," European Journal of Operational Research, Elsevier, vol. 187(3), pages 985-1032, June.
    80. Averbakh, Igor & Berman, Oded & Chernykh, Ilya, 2006. "The routing open-shop problem on a network: Complexity and approximation," European Journal of Operational Research, Elsevier, vol. 173(2), pages 531-539, September.
    81. Averbakh, Igor & Berman, Oded & Chernykh, Ilya, 2005. "A -approximation algorithm for the two-machine routing open-shop problem on a two-node network," European Journal of Operational Research, Elsevier, vol. 166(1), pages 3-24, October.
    82. Alena Otto & Xiyu Li & Erwin Pesch, 2017. "Two-Way Bounded Dynamic Programming Approach for Operations Planning in Transshipment Yards," Transportation Science, INFORMS, vol. 51(1), pages 325-342, February.
    83. Stanisław Gawiejnowicz, 2020. "A review of four decades of time-dependent scheduling: main results, new topics, and open problems," Journal of Scheduling, Springer, vol. 23(1), pages 3-47, February.
    84. J. A. Buzacott & David D. Yao, 1986. "Flexible Manufacturing Systems: A Review of Analytical Models," Management Science, INFORMS, vol. 32(7), pages 890-905, July.
    85. Carlier, Jacques & Haouari, Mohamed & Kharbeche, Mohamed & Moukrim, Aziz, 2010. "An optimization-based heuristic for the robotic cell problem," European Journal of Operational Research, Elsevier, vol. 202(3), pages 636-645, May.
    86. Liou, Cheng-Dar & Hsieh, Yi-Chih, 2015. "A hybrid algorithm for the multi-stage flow shop group scheduling with sequence-dependent setup and transportation times," International Journal of Production Economics, Elsevier, vol. 170(PA), pages 258-267.
    87. Baumann, Philipp & Trautmann, Norbert, 2014. "A hybrid method for large-scale short-term scheduling of make-and-pack production processes," European Journal of Operational Research, Elsevier, vol. 236(2), pages 718-735.
    88. Soukhal, A. & Martineau, P., 2005. "Resolution of a scheduling problem in a flowshop robotic cell," European Journal of Operational Research, Elsevier, vol. 161(1), pages 62-72, February.
    89. Shabtay, Dvir & Arviv, Kfir & Stern, Helman & Edan, Yael, 2014. "A combined robot selection and scheduling problem for flow-shops with no-wait restrictions," Omega, Elsevier, vol. 43(C), pages 96-107.
    90. Jingyuan Lei & Jizhuang Hui & Fengtian Chang & Salim Dassari & Kai Ding, 2023. "Reinforcement learning-based dynamic production-logistics-integrated tasks allocation in smart factories," International Journal of Production Research, Taylor & Francis Journals, vol. 61(13), pages 4419-4436, July.
    91. Vis, Iris F.A., 2006. "Survey of research in the design and control of automated guided vehicle systems," European Journal of Operational Research, Elsevier, vol. 170(3), pages 677-709, May.
    92. S. M. Johnson, 1954. "Optimal two‐ and three‐stage production schedules with setup times included," Naval Research Logistics Quarterly, John Wiley & Sons, vol. 1(1), pages 61-68, March.
    93. Xin Wen & Yige Sun & Hoi-Lam Ma & Sai-Ho Chung, 2023. "Green smart manufacturing: energy-efficient robotic job shop scheduling models," International Journal of Production Research, Taylor & Francis Journals, vol. 61(17), pages 5791-5805, September.
    94. Quang-Vinh Dang & Cong Thanh Nguyen & Hana Rudová, 2019. "Scheduling of mobile robots for transportation and manufacturing tasks," Journal of Heuristics, Springer, vol. 25(2), pages 175-213, April.
    95. Zhi-Long Chen, 2010. "Integrated Production and Outbound Distribution Scheduling: Review and Extensions," Operations Research, INFORMS, vol. 58(1), pages 130-148, February.
    96. J. Arturo Castillo-Salazar & Dario Landa-Silva & Rong Qu, 2016. "Workforce scheduling and routing problems: literature survey and computational study," Annals of Operations Research, Springer, vol. 239(1), pages 39-67, April.
    97. Crama, Yves, 1997. "Combinatorial optimization models for production scheduling in automated manufacturing systems," European Journal of Operational Research, Elsevier, vol. 99(1), pages 136-153, May.
    98. Sun, Yige & Chung, Sai-Ho & Wen, Xin & Ma, Hoi-Lam, 2021. "Novel robotic job-shop scheduling models with deadlock and robot movement considerations," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 149(C).
    99. Chengkuan Zeng & Jiafu Tang & Zhi-Ping Fan, 2019. "Auction-based cooperation mechanism for cell part scheduling with transportation capacity constraint," International Journal of Production Research, Taylor & Francis Journals, vol. 57(12), pages 3831-3846, June.
    100. Peter Brucker & Sigrid Knust, 2002. "Lower Bounds for Scheduling a Single Robot in a Job-Shop Environment," Annals of Operations Research, Springer, vol. 115(1), pages 147-172, September.
    101. Mohamed Amine Mkadem & Aziz Moukrim & Mehdi Serairi, 2021. "Exact method for the two-machine flow-shop problem with time delays," Annals of Operations Research, Springer, vol. 298(1), pages 375-406, March.
    102. D Rebaine & V A Strusevich, 1999. "Two-machine open shop scheduling with special transportation times," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 50(7), pages 756-764, July.
    103. Yu, Wei & Liu, Zhaohui & Wang, Leiyang & Fan, Tijun, 2011. "Routing open shop and flow shop scheduling problems," European Journal of Operational Research, Elsevier, vol. 213(1), pages 24-36, August.
    104. Xu Xin & Qiangqiang Jiang & Cui Li & Sihang Li & Kang Chen, 2023. "Permutation flow shop energy-efficient scheduling with a position-based learning effect," International Journal of Production Research, Taylor & Francis Journals, vol. 61(2), pages 382-409, January.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Ahmadian, Mohammad Mahdi & Khatami, Mostafa & Salehipour, Amir & Cheng, T.C.E., 2021. "Four decades of research on the open-shop scheduling problem to minimize the makespan," European Journal of Operational Research, Elsevier, vol. 295(2), pages 399-426.
    2. Berterottière, Lucas & Dauzère-Pérès, Stéphane & Yugma, Claude, 2024. "Flexible job-shop scheduling with transportation resources," European Journal of Operational Research, Elsevier, vol. 312(3), pages 890-909.
    3. Dauzère-Pérès, Stéphane & Ding, Junwen & Shen, Liji & Tamssaouet, Karim, 2024. "The flexible job shop scheduling problem: A review," European Journal of Operational Research, Elsevier, vol. 314(2), pages 409-432.
    4. Arash Amirteimoori & Reza Kia, 2023. "Concurrent scheduling of jobs and AGVs in a flexible job shop system: a parallel hybrid PSO-GA meta-heuristic," Flexible Services and Manufacturing Journal, Springer, vol. 35(3), pages 727-753, September.
    5. Allahverdi, Ali & Ng, C.T. & Cheng, T.C.E. & Kovalyov, Mikhail Y., 2008. "A survey of scheduling problems with setup times or costs," European Journal of Operational Research, Elsevier, vol. 187(3), pages 985-1032, June.
    6. Blazewicz, Jacek & Domschke, Wolfgang & Pesch, Erwin, 1996. "The job shop scheduling problem: Conventional and new solution techniques," European Journal of Operational Research, Elsevier, vol. 93(1), pages 1-33, August.
    7. Xiong, Hegen & Fan, Huali & Jiang, Guozhang & Li, Gongfa, 2017. "A simulation-based study of dispatching rules in a dynamic job shop scheduling problem with batch release and extended technical precedence constraints," European Journal of Operational Research, Elsevier, vol. 257(1), pages 13-24.
    8. Dalila B. M. M. Fontes & Seyed Mahdi Homayouni, 2019. "Joint production and transportation scheduling in flexible manufacturing systems," Journal of Global Optimization, Springer, vol. 74(4), pages 879-908, August.
    9. Fatemi-Anaraki, Soroush & Tavakkoli-Moghaddam, Reza & Foumani, Mehdi & Vahedi-Nouri, Behdin, 2023. "Scheduling of Multi-Robot Job Shop Systems in Dynamic Environments: Mixed-Integer Linear Programming and Constraint Programming Approaches," Omega, Elsevier, vol. 115(C).
    10. Olatunde T. Baruwa & Miquel A. Piera, 2016. "A coloured Petri net-based hybrid heuristic search approach to simultaneous scheduling of machines and automated guided vehicles," International Journal of Production Research, Taylor & Francis Journals, vol. 54(16), pages 4773-4792, August.
    11. Christian Artigues & Dominique Feillet, 2008. "A branch and bound method for the job-shop problem with sequence-dependent setup times," Annals of Operations Research, Springer, vol. 159(1), pages 135-159, March.
    12. Rego, César & Duarte, Renato, 2009. "A filter-and-fan approach to the job shop scheduling problem," European Journal of Operational Research, Elsevier, vol. 194(3), pages 650-662, May.
    13. Antonina P. Khramova & Ilya Chernykh, 2021. "A new algorithm for the two-machine open shop and the polynomial solvability of a scheduling problem with routing," Journal of Scheduling, Springer, vol. 24(4), pages 405-412, August.
    14. Jain, A. S. & Meeran, S., 1999. "Deterministic job-shop scheduling: Past, present and future," European Journal of Operational Research, Elsevier, vol. 113(2), pages 390-434, March.
    15. Guinet, Alain & Legrand, Marie, 1998. "Reduction of job-shop problems to flow-shop problems with precedence constraints," European Journal of Operational Research, Elsevier, vol. 109(1), pages 96-110, August.
    16. Sun, Yige & Chung, Sai-Ho & Wen, Xin & Ma, Hoi-Lam, 2021. "Novel robotic job-shop scheduling models with deadlock and robot movement considerations," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 149(C).
    17. Francis Sourd & Wim Nuijten, 2000. "Multiple-Machine Lower Bounds for Shop-Scheduling Problems," INFORMS Journal on Computing, INFORMS, vol. 12(4), pages 341-352, November.
    18. Müller, David & Müller, Marcus G. & Kress, Dominik & Pesch, Erwin, 2022. "An algorithm selection approach for the flexible job shop scheduling problem: Choosing constraint programming solvers through machine learning," European Journal of Operational Research, Elsevier, vol. 302(3), pages 874-891.
    19. Yu, Wei & Liu, Zhaohui & Wang, Leiyang & Fan, Tijun, 2011. "Routing open shop and flow shop scheduling problems," European Journal of Operational Research, Elsevier, vol. 213(1), pages 24-36, August.
    20. Rossi, Andrea, 2014. "Flexible job shop scheduling with sequence-dependent setup and transportation times by ant colony with reinforced pheromone relationships," International Journal of Production Economics, Elsevier, vol. 153(C), pages 253-267.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:315:y:2024:i:3:p:821-843. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.