Author
Listed:
- Erni Yusnida Ariffin
(Department of Quantity Surveying, Faculty of Built Environment and Surveying, Universiti Teknologi Malaysia, 81310 Johor Bahru, Johor, Malaysia)
- Mohd Saidin Misnan
(Department of Quantity Surveying, Faculty of Built Environment and Surveying, Universiti Teknologi Malaysia, 81310 Johor Bahru, Johor, Malaysia)
- Maimunah Sapri
(Department of Real Estate, Faculty of Built Environment and Surveying, Universiti Teknologi Malaysia, 81310, Skudai, Johor, Malaysia)
Abstract
Building Information Modelling (BIM) aims to support the whole-of-life project life cycle. BIM has been practiced broadly at the design and construction stages in the Malaysian construction industry. However, it has not yet been extensively implemented in the Facility Management (FM) industry. The adoption of BIM-FM integration is complex, and the information on the adoption of BIM in the FM process is still scarce. Hence, to improve early integration of FM in BIM project, it is necessary to understand the adoption factors from various level of FM management. Thus, this research aimed to address this gap by examining the factors influencing the Facility Management Organization (FMO) in adopting the BIM-FM integration into the early phase of the BIM project. A qualitative method was adopted, and a semi-structured interview was utilised as the primary method to execute the research objective. The data were thematically analysed. The results revealed various issues influencing the BIM-FM adoption at the early phase of the BIM project. It has been concluded that there are twenty-three (23) relevant factors that contribute to the adoption BIM-FM integration. The findings of this study expected to offer better understanding to the significant factors and provide a strategy in activation the integration of BIM-FM the early BIM project in Malaysia. However, this study not considered the essential factors that contribute to the adoption process.
Suggested Citation
Erni Yusnida Ariffin & Mohd Saidin Misnan & Maimunah Sapri, 2024.
"Factors Affecting the Adoption of BIM-FM Integration at the Early Phase of the BIM Project,"
International Journal of Research and Innovation in Social Science, International Journal of Research and Innovation in Social Science (IJRISS), vol. 8(8), pages 4771-4782, August.
Handle:
RePEc:bcp:journl:v:8:y:2024:i:8:p:4771-4782
Download full text from publisher
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:bcp:journl:v:8:y:2024:i:8:p:4771-4782. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Dr. Pawan Verma (email available below). General contact details of provider: https://rsisinternational.org/journals/ijriss/ .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.