- Olamide, Eniola, Victor (PhD)
(Urban and Regional Planning Department, The Federal Polytechnic, Ado Ekiti, Nigeria)
- Daramola, Joshua, Olusola
(Urban and Regional Planning Department, The Federal Polytechnic, Ado Ekiti, Nigeria)
- Adebayo Abimbola, A
(Architectural Technology Department, The Federal Polytechnic, Ado Ekiti, Nigeria)
Abstract
Background And Objectives: Actualizing constant supply of electricity is the desire of every nation as it facilitates economic development and national growth, some nations had gone the way of privatisation The privatisation of the power sector had been the strategy embarked upon across the globe aiming at finding probable last solution to the menace of incessant power failure most especially in the developing nations which is detrimental to their economic development. The consideration for adequate functioning of electrical infrastructure facilities before the full privatisation of the power sector as fundamental to effective electricity service delivery is the main focus of this study as it applies to Nigeria. The paper stresses that the poor functional condition of these electrical facilities was one of the causes of the poor performance of electricity service delivery after privatisation. Hence, the paper opined that the functional condition of these electrical infrastructure facilities ought to have been put into consideration before embarking on the privatisation of electricity service delivery. Methods: The study draws its information from the extant publications on infrastructure facilities that are relevant to the case study. The study adopted on the spot observation and assessment of facilities in the study area. The electrical facilities considered in this study were the distribution transformer, electric poles, and electric wire and cables. Tertiary data were also made use. Finding: The study based on the findings from the literature recommended that the policymakers, decision-makers, relevant government officials, and all concerned stakeholders should go back to the roundtable and hold an in-depth, thoughtful deliberation that will factor in the consideration for the indispensability of electrical infrastructure facilities to successful privatisation of power sector. Conclusion: Conclusively, figure 4,5,6,7, and 8 gave the visual condition of the electrical facilities state. Hence, prioritising these facilities before privatisation is imperative.
Suggested Citation
Olamide, Eniola, Victor (PhD) & Daramola, Joshua, Olusola & Adebayo Abimbola, A, 2020.
"Prioritizing Functional Infrastructure Facilities for Sustainable Privatisation of Electricity Service Delivery In Nigeria,"
International Journal of Research and Innovation in Social Science, International Journal of Research and Innovation in Social Science (IJRISS), vol. 4(8), pages 563-572, August.
Handle:
RePEc:bcp:journl:v:4:y:2020:i:8:p:563-572
Download full text from publisher
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:bcp:journl:v:4:y:2020:i:8:p:563-572. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Dr. Pawan Verma (email available below). General contact details of provider: https://rsisinternational.org/journals/ijriss/ .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.