Cindy Menches Awad Hanna Erik Nordheim Jeffrey Russell
Abstract
The mild recession experienced in the early part of this decade forced many US electrical contractors to reduce their profit margins as a way to win jobs and survive economically. However, to make up for lower profit margins, contractors turned to 'better planning' as a method for improving their efficiency and increasing their profitability. In general, contractors believe that better planning contributes to better project performance, but the evidence has been mostly anecdotal. A study was conducted recently that transformed anecdotal evidence about the impact of pre-construction planning on performance into quantitative evidence. The research resulted in the development of a model pre-construction planning process that was based on outstanding projects that were well planned and performed well. The study quantified the relationship between pre-construction planning activities, project characteristics and performance, and a separate validation study found that those projects that performed a comprehensive planning process similar to the model planning process were more likely to achieve their estimated work hours, profit, budget and completion goals.
Download Info
To download:
If you experience problems downloading a file, check if you have the
proper application to
view it first. Information about this may be contained
in the File-Format links below. In case of further problems read
the IDEAS help
page. Note that these files are not on the IDEAS
site. Please be patient as the files may be large.
As the access to this document is restricted, you may want to look for a different version under "Related research" (further below) or search for a different version of it.